SUPPORT THE WORK

GetWiki

New Pendolino

ARTICLE SUBJECTS
aesthetics  →
being  →
complexity  →
database  →
enterprise  →
ethics  →
fiction  →
history  →
internet  →
knowledge  →
language  →
licensing  →
linux  →
logic  →
method  →
news  →
perception  →
philosophy  →
policy  →
purpose  →
religion  →
science  →
sociology  →
software  →
truth  →
unix  →
wiki  →
ARTICLE TYPES
essay  →
feed  →
help  →
system  →
wiki  →
ARTICLE ORIGINS
critical  →
discussion  →
forked  →
imported  →
original  →
New Pendolino
[ temporary import ]
please note:
- the content below is remote from Wikipedia
- it has been imported raw for GetWiki
{{Short description|Italian high-speed tilting train}}{{Multiple issues|{{More citations needed|date=November 2012}}{{Advert|date=June 2014}}}}







factoids
26.2ftinabbr=on}} (total length {{Convertmfrac=8abbr=on}})2.83ftinabbr=on}}| height = | floorheight = | platformheight = | entrylevelorstep = | doors = | art-sections = class=nowrap|
|Service:
|{{Convert|250|km/h|abbr=on|round=5{edih}
|Record:
|{{Convert|293|km/h|0|abbr=on}}
}}387lk=on421abbr=on}} (loaded)16.5abbr=on}} (with passengers)| acceleration = | deceleration = | traction = | engine = 5,500abbr=on|0}}| transmission = | aux = | powersupply = | hvac = Volt>kV Direct current – {{25 kV 50 Hz}} (ETR 600)3 kV DC – {{25 kV 50 Hz}} – 15 kV AC>15 kV 16⅔ Hz AC (ETR 610)| collectionmethod = | uicclass = | aarwheels = | bogies = | brakes = | safety = | coupling = | multipleworking = sg|allk=on}}}}The New Pendolino is a class of high-speed tilting trains built by Alstom Ferroviaria (Fiat Ferroviaria) for Trenitalia and Cisalpino.As of 2024, Pendolinos have become a part of the Avelia Stream high speed train family.WEB, Avelia Stream: High-speed trains with a wide range of applications,weblink 2024-01-10, Alstom, en,

Operational history

Background

The name Pendolino is used to identify a family of high-speed, tilting-technology trains, produced in Italy. These trains owe their name ((:wikt:pendolino|pendolino) can mean "small pendulum" in Italian) to the mechanism enabling them to tilt when going around a curve. The maximum tilt of 8 degrees allows the trains to reach a speed that is up to 35% higher than conventional trains whilst remaining comfortable for passengers. Developed by Alstom Ferroviaria, which inherited tilting technology (including that of the British Advanced Passenger Train) after its acquisition of former producer Fiat Ferroviaria, they are built at Alstom's Savigliano plants, in Piedmont, as well as in Sesto San Giovanni near Milan (which supplies the traction converters).The Pendolino first began service in Italy in 1988, with model ETR 450, followed by ETR 460, ETR 470 and ETR 480. A new model generation was launched in 2006 with ETR 600 for Trenitalia and ETR 610 / RABe 503 for Cisalpino, a railway company that operated trains between Switzerland and Italy. Manufacturer Alstom labeled them as New Pendolino.

ETR 600-610 (Italy) / RABe 503 (Switzerland)

File:SBB ETR 610 Salgesch.jpg|thumb|left|An SBB ETR 610 in ValaisValaisThe ETR 610 / RABe 503 (also known as the Cisalpino Due as it was the second class of tilting trains used by Cisalpino) primarily differs from the ETR 600 in the sense that the ETR 610 / RABe 503 supports the voltage and signalling systems used in Switzerland and Germany. This includes the need for much heavier on-board traction power transformers necessary as a result of the lower traction power frequency of 16.7 Hz used in Switzerland and Germany in comparison with those required for the 25 kV 50 Hz AC traction power supplies. The innovative features concern the interior and exterior design, now closer to the customers’ brand strategy and an improved comfort and services for passengers. Moreover, some important technical characteristics have been increased, such as the power of the traction unit and the level of redundancy of components and equipment, in order to improve reliability. The new trains will be produced in full accordance with the new regulations governing interoperability (for example, passive security in case of impact).Initial testing of the type revealed some shortcomings, perhaps the most significant of which was that the type was too heavy for the main Gotthard route from Zurich to Milan for which they had been ordered for. In fact, the ETR 610's weight impacted the train's permitted cornering speed due to forces exerted upon the track that it compelled a lower-than-expected operating speed; it was determined that the new trains would have to run so slowly that traditional trains that lacked tilting systems would be just as fast, and thus some officials publicly questioned the project's value."The new Cisalpino is too heavy for the Gotthard", Tagesanzeiger (Translation)."A train that fails to arrive", Swissinfo. The original intended schedule for the type's introduction was to coincide with the December 2007 timetable change, together with the opening of the Lötschberg Base Tunnel; however, it was deferred and rescheduled for spring 2009, this date was also missed. During August 2009, the ETR 610 fleet finally achieved sufficient progress as to permit it to enter revenue service. The train is run on international routes between Switzerland and Italy; it is also used to conduct a single daily trip from Frankfurt (Main) Hauptbahnhof to Milano Centrale via the Gotthard Base Tunnel and back via Simplon Tunnel and Lötschberg Base Tunnel to Frankfurt.JOURNAL, Frei, Stephan, Eisenbahn-Amateur, Eisenbahn Amateurh, 1 December 2017, 551,weblink 1 December 2017, de-DE, In 2018, the fleet was rebranded as Astoro following a refurbishment. In January 2023, the SBB announced a SFr 120m ($US 131.2m) investment in an extensive refurbishment of the ETR 610 fleet to facilitate its continued operation for a further 15 years. The program involves renewing and replacing various components and systems, repainting the vehicle bodies, and making minor accessibility improvements in compliance with Swiss federal disabilities legislation.WEB,weblink SBB begins Astoro tilting train refurbishment, International Railway Journal, Simon, Artymiuk, 18 January 2023,

ED250 (Poland)

File:WK15 Wrocław Główny (2) Lichen99.jpg|thumb|ED250 at Wrocław GłównyWrocław Główny(File:1_WK14_ED250-007_wnętrze_2_klasa_z8.JPG|thumb|left|Second class interior of a PKP ED250 unit)On 30 May 2011 the Polish state railways PKP signed an agreement with Alstom for 20 Pendolinos ETR 610.WEB,weblink PKP Intercity signs Pendolino contract, Railwaygazette.com, 29 July 2018, WEB,weblink PKP Intercity zamawia 20 pociągów New Pendolino, Gazetakrakowska.pl, 30 May 2011, 29 July 2018, These new trains, referred to as Pendolino ED250, were procured with the intent of operating them several major trunk routes, including between Gdynia and Warsaw, on the high-speed CMK Central Rail Line from Kraków/Katowice to Warsaw and Wrocław to Warsaw.WEB,weblink Polish high speed rail project cancelled, Railwaygazette.com, 29 July 2018, On 12 August 2013, the first ETR 610 was delivered.WEB,weblink Press Centre - Alstom, Alstom.com, 29 July 2018,weblink" title="web.archive.org/web/20130927083005weblink">weblink 27 September 2013, dead, High speed tests involving the new trainset were largely conducted on the CMK Central Rail Line; on 16 November, the first day of testing, the Pendolino reached {{convert|242|km/h|mph||abbr=on}}.WEB,weblink Pendolino osiągnęło na CMK 242 km/h, Kurier, Kolejowy, Kurierkolejowy.eu, 29 July 2018, On 17 November 2013, a new speed record for Polish railways was set when the Pendolino ED250 reached a speed of {{convert|291|km/h|mph|0|abbr=on}},WEB,weblink 291 km/h. Nowy rekord prędkości polskiego Pendolino, Tvn24.pl, 29 July 2018, breaking the previous record of {{convert|250.1|km/h|mph||abbr=on}} set 19 years prior. On 24 November 2013, the final day of tests on the CMK Central Rail Line, the Pendolino reached {{convert|293|km/h|mph|0|abbr=on}}.WEB,weblink Wszystko na temat branży kolejowej: PKP, Intercity, przewozy regionalne, koleje mazowieckie, rozkłady jazdy PKP, Kolej, Rynek-kolejowy.pl, 29 July 2018, The contract between the Polish operator PKP Intercity and Alstom called for the first eight Pendolino ED250 trainsets to be delivered on 6 May 2014, tested ('homologated') for operation at {{Convert|250|km/h|abbr=on|round=5}} using ETCS L2 signalling. These tests had not been performed by May, and PKP announced that Alstom had failed to meet the contract terms and would be charged penalties as of May 6.WEB,weblink Pendolino bez homologacji. Od jutra będą kary, Kurier, Kolejowy, Kurierkolejowy.eu, 29 July 2018, Alstom responded that homologation in Poland at {{Convert|250|km/h|abbr=on|round=5}} using ETCS Level 2 was impossible, since ETCS Level 2 was not operational anywhere in Poland, and the Central Rail Line (where the first ED250 Pendolino had reached {{convert|293|km/h|mph|0|abbr=on}} in testing) was equipped with ETCS Level 1, not Level 2.WEB,weblink First ETCS certified in Poland, Railwaygazette.com, 29 July 2018, On 26 June 2014, a compromise was reached between PKP and Alstom under which the Pendolinos would be delivered under a two-stage homologation, first homologated for operation using ETCS Level 1 and eventually to be homologated for ETCS Level 2. Hopes were expressed that the Pendolinos could be in service by 14 December 2014.WEB,weblink Polskie Radio Online, Polskieradio.pl, 29 July 2018, WEB,weblink Archived copy, 5 July 2014,weblink" title="web.archive.org/web/20141006070337weblink">weblink 6 October 2014, dead, On 11 September 2014, Polands's Railway Transport Office (UTK) announced that the ED250 had been certified for operation at up to {{Convert|250|km/h|mph|0|abbr=on}} in accordance with the relevant Technical Specifications for Interoperability (TSI).WEB,weblink Polish Pendolinos gain 250km/h certification, 17 September 2014, Keith, Barrow, In the 2020/21 timetable, ED250 routinely operated at a scheduled speed of up to {{convert|200|km/h|mph|0|abbr=on}} along selected stretches of the Warszawa - Gdynia and Central Rail Line routes.WEB,weblink Rekordowo szybkie Pendolino. Od grudnia z Warszawy do Gdańska w dwie i pół godziny, Polish Pendolino trainsets do not have tilting mechanism which precludes them from the main advantage of faster taking of curves. In 2020, one train did derail in Germany during an instrumented test run.WEB,weblink Zug kollidiert mit Rangierlok: Lokführer in Klinik, Germany, Abendzeitung, www.abendzeitung-muenchen.de, 8 April 2020, de, 9 April 2020,

Avant S-114 (Spain)

File:Serie_114_de_Renfe_en_Valladolid-Campo_Grande.jpg|thumb|A Renfe Avant S-114 train at Valladolid-Campo Grande ]]The Avant S-114, locally designated as the RENFE Class 114, is a four-car variant of the New Pendolino series. During October 2004, it was announced that RENFE had placed an order for 30 high-speed trains, configured for medium distance routes and thus lacking tilting mechanisms.WEB,weblink RENFE awards ALSTOM-CAF consortium two orders worth more than 1.7 billion euros, 30 October 2004, Alstom, 19 January 2009, {{Dead link|date=November 2018 |bot=InternetArchiveBot |fix-attempted=yes }} The order, which was subsequently reduced to thirteen trainsets, supplemented the operator's older fleet of Class 104 Pendolinos.WEB,weblink Alta Velocidad para distancias medias, [Líneas del Tren 55], 21 December 2004, [Líneas del Tren], es, 19 January 2009, {{Dead link|date=September 2010|bot=H3llBot}}WEB,weblink Accelerated development: European regional high-speed, International Railway Journal, 9 October 2014, Keith, Barrow, In autumn 2008, the first train of the new class was formally presented.WEB,weblink Presentadas las nuevas series 114, 121, 449, 599 y Trenhotel de Renfe, 30 October 2008, [Vía Libre], es, 19 January 2009, The RENFE has operated its S-114 fleet on its high-speed services between Madrid, Segovia, and Valladolid, along the high-speed line.WEB,weblink Renfe estrena nuevos Avant y aumenta un 20% las plazas entre Valladolid, Segovia y Madrid, June 2011,

ETR 675 (Italy)

File:Etr675PortaNuova.jpg|thumb|ETR 675 NTV in Torino Porta Nuova railway stationTorino Porta Nuova railway stationThe Pendolino EVO ETR 675 operated by the open-access high-speed operator Nuovo Trasporto Viaggiatori (NTV), is a member of the Avelia family of Alstom, which also includes other rolling stock produced and operated across various different countries. The ETR 675, akin to the model operated by PKP, is not equipped with tilting apparatus. The name Pendolino, however, evidently remains as a brand for trains that can be structured both with and without oscillation.During October 2015, NTV announced that it would be procuring an initial batch of twelve ETR 675 trainsets as part of its efforts to expand its fleet via a contract valued at €460m.WEB,weblink Transformation at Italo-NTV, Railway Gazette, 16 October 2019, Andrea, Giuricin, WEB,weblink Alstom and NTV reveal Pendolino design, International Railway Journal, 18 December 2015, Kevin, Smith, In comparison with the operator's preceding fleet of Automotrice à grande vitesse (AGV) trainsets, the new train's maximum speed was approximately {{Convert|50|km/h|mph|0|abbr=on}} slower; the new fleet was reportedly intended to facilitate NTV's expansion of its Italo services, as well as to introduce services to new destinations.NEWS,weblink 6 October 2015, Railway Gazette: Open access operator NTV to order Pendolinos, Railway Gazette International, On 3 October 2013, the first of NTV's Pendolinos was publicly presented at the Expo Ferroviaria exhibition in Milan; by this point, the type was undergoing certification trials ahead of operating regular revenue service.WEB, David, Briginshaw,weblink First Alstom Evo train for NTV unveiled in Milan, International Railway Journal, 3 October 2017, In November 2017, NTV announced that it was exercising an option to purchase an additional five trainsets.WEB,weblink More Pendolinos for NTV, International Railway Journal, 10 November 2017, Keith, Barrow, On 7 December 2017, the first four out of NTV's 17 ETR 675 trains entered service on its route between Rome and Venice, enabling the operator to was increase the number of daily services on its network from 56 to 68. The introduction of the rest of the fleet saw service frequencies being further increased across 2018 to 90 trains per day.WEB,weblink NTV Evo Pendolino trains enter service, International Railway Journal, 12 December 2017, Marco, Chiandoni,

CRH5A (China)

File:Crh5 in Shenzhen.jpg|thumb|CRH5A in Shenyang, Liaoning, ChinaChinaChina Railway High-speed (CRH) purchased technologies from Alstom to assemble 60 sets of high speed EMU trains, which have been named CRH5 and are based on the New Pendolino trains. The CRH5 are non-tilting trains. 30 additional sets were ordered in 2009 and 20 additional sets was ordered in 2010 to complete the current fleet operating on China's northern and eastern lines.WEB,weblink 四方所同长春轨道客车股份有限公司获2亿CRH5型动车组大订单-中国起重机吊车网, www.qizhong7.com, 6 April 2018, dead,weblink" title="web.archive.org/web/20160303215609weblink">weblink 3 March 2016, WEB,weblink 中国北车 签订总额达52亿元重大合同_新闻_新民网, 2010-12-30, live,weblink" title="web.archive.org/web/20110707053912weblink">weblink 2011-07-07,

Technical characteristics

The trains have the following characteristics:
  • Seven cars, 4 motors and 3 trailers
  • Gauge: {{RailGauge|1435mm}}
  • Voltage:
    • ETR 600 (Trenitalia): 3 kV DC – 25 kV AC
    • ETR 610 (Trenitalia and Swiss Federal Railways): 3 kV DC – 25 kV AC – 15 kV (16.7 Hz) AC
  • Length of coach: {{Convert|26.2|m|ftin}} (total length {{Convert|28.2|m|ftin|disp=or}})
  • Total length: {{Convert|187.4|m|ftin|abbr=on}}
  • Width: {{Convert|2.83|m|ftin|abbr=on}}
  • Maximum load per axle: {{Convert|16.5|t|abbr=on}} (with passengers)
  • Weight: {{Convert|387|t|lk=on|abbr=on}}
  • Total weight under normal load (with seated passengers): {{Convert|421|t|abbr=on}}
  • Maximum speed: {{Convert|250|km/h|0|abbr=on}}
  • Total installed power: {{Convert|5,500|kW|4=0|abbr=on}}
  • Seating: 430 +2 for wheel chair users
  • Tilting actuating system: electro-hydraulic
  • HVAC system with built-in redundancy
Many of the new Pendolinos have been fitted with the European Train Control System (ETCS) Level 2 signalling system; some operations, such as the Swiss Federal Railway (ETR 610) have installed other signalling systems such as SCMT, ZUB, LZB, and Integra-Signum, in order to operate over lines not equipped with ETCS.

See also

References

{{Reflist}}

External links

  • weblink" title="web.archive.org/web/20140808054328weblink">Pendolino – Alstom
{{Pendolino}}{{high-speed rail}}{{FS EMUs and DMUs}}

- content above as imported from Wikipedia
- "New Pendolino" does not exist on GetWiki (yet)
- time: 11:04pm EDT - Thu, Apr 25 2024
[ this remote article is provided by Wikipedia ]
LATEST EDITS [ see all ]
GETWIKI 23 MAY 2022
GETWIKI 09 JUL 2019
Eastern Philosophy
History of Philosophy
GETWIKI 09 MAY 2016
GETWIKI 18 OCT 2015
M.R.M. Parrott
Biographies
GETWIKI 20 AUG 2014
CONNECT