SUPPORT THE WORK

GetWiki

MAX Blue Line

ARTICLE SUBJECTS
aesthetics  →
being  →
complexity  →
database  →
enterprise  →
ethics  →
fiction  →
history  →
internet  →
knowledge  →
language  →
licensing  →
linux  →
logic  →
method  →
news  →
perception  →
philosophy  →
policy  →
purpose  →
religion  →
science  →
sociology  →
software  →
truth  →
unix  →
wiki  →
ARTICLE TYPES
essay  →
feed  →
help  →
system  →
wiki  →
ARTICLE ORIGINS
critical  →
discussion  →
forked  →
imported  →
original  →
MAX Blue Line
[ temporary import ]
please note:
- the content below is remote from Wikipedia
- it has been imported raw for GetWiki
{{short description|Light rail line in Portland, Oregon}}{{good article}}{{use mdy dates|date=December 2019}}







factoids
Westside segment:Westside MAXHTTPS://TRIMET.ORG/PUBLICATIONS/PDF/FACTSHEETS/MAX-BLUELINE-WESTSIDE.PDF PUBLISHER=TRIMET ACCESS-DATE=SEPTEMBER 30, 2019 ARCHIVE-DATE=MARCH 2, 2019, live, TriMet|blue}}| image = MAX train crossing Steel Bridge in 2009 - street view of SD660 LRVs.jpg| image_width = | image_alt = A light-rail train crossing a bridgeTriMetsize=24}}| caption = A Blue Line train crossing the Steel Bridge in Portland| type = Light rail| system = MAX Light Rail| status = | locale = Portland, Oregon, U.S.Hatfield Government Center}} in Hillsboro (west)Cleveland Avenue}} in Gresham (east)TITLE=TRIMET TO MAKE MAX SERVICE MORE EFFICIENT WITH CLOSURE OF THREE STATIONS IN DOWNTOWN PORTLAND IN MARCH 2020 DATE=JULY 24, 2019 ACCESS-DATE=JULY 24, 2019 ARCHIVE-DATE=JULY 24, 2019, live, | website = MAX Blue Line| routes = 2018lc=yes}})SEPTEMBER 2018 MONTHLY PERFORMANCE REPORT >URL=HTTPS://TRIMET.ORG/ABOUT/PDF/2018/2018-09.PDF ACCESS-DATE=FEBRUARY 21, 2019 ARCHIVE-DATE=FEBRUARY 22, 2019, TriMet| operator = TriMet| character = At-grade, elevated, and underground| stock = 33kmabbr=on}}{{efn|name=rounding}}| tracklength = | tracks = 2ussg|allk=on}}| minradius = YEAR=2012 NATIONAL RAILWAY HISTORICAL SOCIETY >LOCATION=PORTLAND, OREGON ISBN=978-0-9851207-0-2, etal, conductor=overhead}}| speed = | elevation = | map = {{MAX Blue Line}}| map_state = collapsed| map_name = Route diagram}}The MAX Blue Line is a light rail line serving the Portland metropolitan area in the U.S. state of Oregon. Operated by TriMet as part of the MAX Light Rail system, it connects Hillsboro, Beaverton, Portland, and Gresham. The Blue Line is the longest in the network; it travels approximately {{convert|33|mi|km|0}} and serves 48 stations from {{stn|Hatfield Government Center}} to {{stn|Cleveland Avenue}}. It is the busiest of the five MAX lines, having carried an average 55,370 riders each day on weekdays in September 2018. Service runs for 22{{frac|1|2}} hours per day from Monday to Thursday, with headways of between 30 minutes off-peak and five minutes during rush hour. It runs later in the evening on Fridays and Saturdays and ends earlier on Sundays.The success of local freeway revolts in Portland in the early 1970s led to a reallocation of federal assistance funds from the proposed Mount Hood Freeway and Interstate 505 (I-505) projects to mass transit. Among various proposals, local governments approved the construction of a light rail line between Gresham and Portland in 1978. Referred to as the Banfield Light Rail Project during planning and construction as a part of the Banfield Freeway redevelopment, construction of what is now the Eastside MAX segment began in 1983. The line was inaugurated as the Metropolitan Area Express (MAX) on September 5, 1986.Planning for an extension of MAX to the west side began as early as 1979. Known as the Westside MAX, construction was delayed by nearly a decade due to funding disagreements. Originally designed to terminate at 185th Avenue near the border of Hillsboro and Beaverton, proponents for a longer line achieved a supplemental extension to downtown Hillsboro just before groundbreaking in 1993. The Westside MAX opened in two phases following delays in tunnel construction; the first section up to Goose Hollow opened in 1997 while the rest opened on September 12, 1998.In 2000, the two distinct segments, already operating as a single through route between Gresham and Hillsboro, were unified in passenger information as the Blue Line after TriMet introduced a color coding scheme in preparation for the opening of the Red Line to Portland International Airport. The Blue Line currently shares its route with the Red Line on the west side, between Beaverton Transit Center and Rose Quarter Transit Center. On the east side, it shares tracks with both the Red Line and the Green Line, between Rose Quarter Transit Center and Gateway/Northeast 99th Avenue Transit Center.

Eastside history

Early freeway opposition

{{see also|Mount Hood Freeway|Interstate 505 (Oregon)}}Following the recommendations of Robert Moses, the Oregon State Highway Department developed a plan for freeways in the Portland metropolitan area in 1955 that proposed,{{sfn|Fackler|2009|pages=9–10}} among others, the Stadium, Mount Hood, and Industrial freeways.NEWS, Shoemaker, Mervin, Plan Given for Traffic of Future, The Oregonian, June 29, 1955, 1, 33,infoweb.newsbank.com/apps/news/document-view?p=EANX-NB&docref=image%2Fv2%3A11A73E5827618330%40EANX-NB-12BCD5C6DF477322%402435288-12B2D4D018410623%4034, July 8, 2022, registration, NewsBank, July 31, 2022,web.archive.org/web/20220731220543/https://infoweb.newsbank.com/apps/news/user/login?destination=document-view%3Fp%3DEANX-NB%26docref%3Dimage/v2%253A11A73E5827618330%2540EANX-NB-12BCD5C6DF477322%25402435288-12B2D4D018410623%254034, live, Added to the Interstate Highway System as Interstate 405 (I-405), the Stadium Freeway was the first to start construction in 1963.{{sfn|Kramer|2004|p=65}}NEWS, Edwards, Herman, October 13, 1963, Earth-Moving Equipment Starts Gouging Out Bypass Road For Freeway Construction, 40, The Oregonian, Its route through downtown Portland led to condemnations that fostered one of the first grassroots opposition to freeways,{{sfn|Kramer|2004|p=66}}{{sfn|Thompson|2005|page=4}} which grew considerably as planning continued for the others.WEB,www.wweek.com/portland/article-23466-feb-4-1974-portland-kills-the-mount-hood-freeway.html, Feb. 4, 1974: Portland kills the Mount Hood Freeway..., Mesh, Aaron, Willamette Week, November 4, 2014,web.archive.org/web/20181010161716/https://www.wweek.com/portland/article-23466-feb-4-1974-portland-kills-the-mount-hood-freeway.html, October 10, 2018, July 26, 2018, In 1971,{{sfn|Thompson|2005|page=2}} the Portland–Vancouver Metropolitan Transportation Study (PVMTS),{{efn|The Portland–Vancouver Metropolitan Transportation Study, also referred to as the “Portland–Vancouver Metropolitan Area Transportation Study”, or PVMATS, by some publications, was an agency charged with highway planning.WEB,library.oregonmetro.gov/fileabbott-a_history_of_metro_may_1991.pdf, Abbott, Carl, Abbott, Margery Post, Abbott: A history of Metro, May 1991, May 1991, Metro (Oregon regional government), Metro, 3, July 10, 2022, July 8, 2022, https:web.archive.org/web/20220708210051library.oregonmetro.gov/fileabbott-a_history_of_metro_may_1991.pdf, live, }} published a “1990 Transportation Plan”.{{sfn|Fackler|2009|page=90}} The plan, later adopted by the Columbia Region Association of Governments (CRAG) as a regional transportation plan,{{sfn|Thompson|2005|page=2}} called for 54 new road and highway projects.{{sfn|United States. Federal Highway Administration|United States. Urban Mass Transportation Administration|Oregon. State Highway Division|1980|page=1-4}}MAGAZINE, Stein, Joseph A., Air pollution is what happens when you drive into town, Northwest Magazine, The Sunday Oregonian, August 26, 1973, 12, https:infoweb.newsbank.com/apps/news/document-view?p=EANX-NB&docref=image%2Fv2%3A11A73E5827618330%40EANX-NB-1311D466F8F02CC8%402441921-130FCF7C2F089617%40154, July 10, 2022, registration, NewsBank, July 31, 2022,web.archive.org/web/20220731220543/https://infoweb.newsbank.com/apps/news/user/login?destination=document-view%3Fp%3DEANX-NB%26docref%3Dimage/v2%253A11A73E5827618330%2540EANX-NB-1311D466F8F02CC8%25402441921-130FCF7C2F089617%2540154, live, That same year, an anti-freeway group called Sensible Transportation Options for People (STOP) was formed, while Neil Goldschmidt ran a successful election campaign on freeway opposition to become a member of the Portland City Council and eventually, mayor.{{sfn|Thompson|2005|page=5}}By 1972, local groups had filed lawsuits against the Oregon Transportation Commission to halt the Mount Hood and Industrial—by then called I-505{{sfn|Kramer|2004|p=70}}—freeways.{{sfn|Fackler|2009|pages=92, 102, 112}} For I-505, a U.S. district court forced the Highway Department to conduct an appropriate environmental impact statement (EIS) after Northwest Portland residents alleged that National Environmental Policy Act guidelines were ignored.{{sfn|Kramer|2004|p=70}}NEWS, Foes sue to halt NW Portland Freeway, The Oregonian, September 18, 1971, NEWS, Impact statement ordered for I-505 freeway corridor, The Oregonian, December 4, 1971, In 1973, a separate EIS prepared by Skidmore, Owings & Merrill determined that if built, the Mount Hood Freeway would only add more traffic to downtown Portland than the surface streets could handle.BOOK, Sultana, Selima, Weber, Joe, Minicars, Maglevs, and Mopeds: Modern Modes of Transportation Around the World: Modern Modes of Transportation around the World, ABC-CLIO, 2016, 978-1440834950, 314,books.google.com/books?id=r8LWCwAAQBAJ&pg=PA314, July 30, 2018, July 31, 2022,web.archive.org/web/20220731220542/https://books.google.com/books?id=r8LWCwAAQBAJ&pg=PA314, live, Then, on February 4, 1974, U.S. District Judge James M. Burns rejected the freeway plan after finding that the corridor selection process failed to follow the appropriate procedures.WEB,www.wweek.com/portland/article-4212-highway-to-hell.html, Highway to Hell, Young, Bob, March 8, 2005, Willamette Week,web.archive.org/web/20180917044251/https://www.wweek.com/portland/article-4212-highway-to-hell.html, September 17, 2018, July 26, 2018, Multnomah County and the City of Portland withdrew their support for the Mount Hood Freeway later that year,{{sfn|Fackler|2009|pages=92–93}} and in 1978, the City of Portland did the same for I-505.{{sfn|Kramer|2004|p=71}}{{sfn|Fackler|2009|page=108}}

Transitway planning and construction

With highway revolts similarly occurring in cities across the country,{{sfn|Fackler|2009|page=112}} the U.S. Congress passed the Federal-Aid Highway Act of 1973 containing a provision that allowed state governments for the first time to transfer federal funds from withdrawn interstate projects to other transportation options,{{sfn|United States. Federal Highway Administration|United States. Urban Mass Transportation Administration|Oregon. State Highway Division|1980|page=1-6}}{{sfn|Thompson|2005|pages=7–8}} including mass transit.MAGAZINE, Weingroff, Richard F., Busting The Trust, Public Roads Magazine, Federal Highway Administration, July–August 2013, 77, 1,highways.dot.gov/public-roads/julyaugust-2013/busting-trust, August 1, 2022, The Mount Hood Freeway and I-505 were officially removed from the Interstate Highway System in 1976 and 1979, respectively, but planning for the use of around $200 million from the Mount Hood Freeway and $154 million from I-505{{sfn|Kramer|2004|pp=72, 74}} on other projects in the Portland area started much earlier.{{sfn|Thompson|2005|pages=7}} In May 1973, Governor Tom McCall assembled a task force to determine alternative uses for the highway funds.{{sfn|United States. Federal Highway Administration|United States. Urban Mass Transportation Administration|Oregon. State Highway Division|1980|page=1-5}} The task force, in turn, recommended a network of “transitways”.{{sfn|Selinger|2019|page=21}} The task force was subsumed into CRAG in 1974, and CRAG incorporated its recommendations in an “Interim Transportation Plan” (ITP) adopted in June 1975.{{sfn|United States. Federal Highway Administration|United States. Urban Mass Transportation Administration|Oregon. State Highway Division|1980|page=1-6}} The ITP identified three corridors for potential funding using the highway funds: Banfield, Oregon City/Johnson Creek, and Sunset (Westside).{{sfn|United States. Federal Highway Administration|United States. Urban Mass Transportation Administration|Oregon. State Highway Division|1980|page=1-6}} In 1976, CRAG moved forward with a detailed study of the Banfield Corridor and put planning for the other corridors on hold.{{sfn|United States. Federal Highway Administration|United States. Urban Mass Transportation Administration|Oregon. State Highway Division|1980|page=1-7}}{{sfn|Thompson|2005|pages=12}} Among five alternatives developed by the Highway Division, including the removal or extension of an existing high-occupancy vehicle lane,NEWS, Hortsch, Dan, Light rail alternative studied for Banfield, The Oregonian, February 3, 1977, C1, a busway had been favored for the Banfield Corridor.NEWS, Meetings on transit ideas slated, The Oregonian, May 4, 1975, C2, Support for light rail on the corridor grew following the mode’s inclusion as a sixth alternative in a 1977 EIS, though there was also opposition.NEWS, Tri-Met board backs Banfield rail option, The Oregonian, February 8, 1977, 1, Notable opposition came from the East County Concerned Citizens; 5,400 individuals signed a petition against any alternative involving light rail for costs and lack of presumed ridership. The group endorsed a plan to add an HOV lane and general lanes to Banfield instead. This opposition was notable, especially in comparison to the 340 individual comments received during a discussion period in 1977–1978.WEB, Banfield Transitway Project, Multnomah County: Hearing and Project Report, TriMet/ODOT, 1978, 28 June 2020,pdxscholar.library.pdx.edu/cgi/viewcontent.cgi?article=1011&context=oscdl_trimet, July 2, 2020,web.archive.org/web/20200702000516/https://pdxscholar.library.pdx.edu/cgi/viewcontent.cgi?article=1011&context=oscdl_trimet, live, In September 1978, TriMet became the first jurisdiction to adopt a resolution supporting a combined light rail and highway expansion plan.NEWS, Hortsch, Dan, Tri-Met board votes to back Banfield light-rail project, The Oregonian, September 27, 1978, F1, Remaining local jurisdictions each announced their support by November,{{sfn|Selinger|2019|page=30}}NEWS, Alesko, Michael, CRAG endorses light rail plan, The Oregonian, November 17, 1978, D3, and the State Transportation Commission approved the project in 1979.NEWS, Hortsch, Dan, Atiyeh to include light-rail system in ‘79–’81 budget, The Oregonian, December 20, 1978, 1, NEWS, McDonough, Sanda, Governor signs bill for light-rail project, The Oregonian, July 24, 1979, B1, The Banfield light rail project received federal approval for construction in September 1980.REPORT, Tri-County Metropolitan Transportation District of Oregon, Banfield Light Rail Project: Conceptual Design Information for the City of Portland,pdxscholar.library.pdx.edu/cgi/viewcontent.cgi?article=1008&context=oscdl_trimet, TriMet Collection, 9, November 1, 1981, July 27, 2018,pdxscholar.library.pdx.edu/cgi/viewcontent.cgi?article=1008&context=oscdl_trimet," title="web.archive.org/web/20150928184313pdxscholar.library.pdx.edu/cgi/viewcontent.cgi?article=1008&context=oscdl_trimet,">web.archive.org/web/20150928184313pdxscholar.library.pdx.edu/cgi/viewcontent.cgi?article=1008&context=oscdl_trimet, September 28, 2015, live, {{rp|36}} Plans for a 27-station, {{convert|15.1|mi|km|1|adj=on}} line,NEWS, Shedd, Tom, MAX: Portland’s Light Rail Is an Instant Success, November 1987, Modern Railroads, 14–15, International Thomson Transport Press, Chicago, Illinois, 0736-2064, REPORT, Transportation Research Circular Number E-3145 – Joint International Light Rail Conference: Growth and Renewal,onlinepubs.trb.org/onlinepubs/circulars/ec145.pdf, Transportation Research Board, July 2010, 0097-8515, 11, May 6, 2019,onlinepubs.trb.org/onlinepubs/circulars/ec145.pdf," title="web.archive.org/web/20180721185212onlinepubs.trb.org/onlinepubs/circulars/ec145.pdf,">web.archive.org/web/20180721185212onlinepubs.trb.org/onlinepubs/circulars/ec145.pdf, July 21, 2018, live, {{efn|name=rounding|Although several sources provide more precise figures, TriMet itself almost always gives only rounded figures for the lengths of the distinct segments of the Blue Line, of {{convert|15|miles}} (Banfield/Eastside MAX), {{convert|12| miles}} (Westside MAX), {{convert|6|miles}} (Westside MAX Hillsboro Extension), and a total of {{convert|33|miles}}, with no tenths digit. At least one TriMet-issued news release referred to the Blue Line’s length as “nearly 33 miles”.WEB, Becker, Tim,news.trimet.org/2018/08/rail-crossing-improvements-in-gresham-to-affect-max-service-auto-traffic/, Rail crossing improvements in Gresham to affect MAX service, auto traffic, TriMet, August 10, 2018, May 6, 2019,news.trimet.org/2018/08/rail-crossing-improvements-in-gresham-to-affect-max-service-auto-traffic/," title="web.archive.org/web/20181214102931news.trimet.org/2018/08/rail-crossing-improvements-in-gresham-to-affect-max-service-auto-traffic/,">web.archive.org/web/20181214102931news.trimet.org/2018/08/rail-crossing-improvements-in-gresham-to-affect-max-service-auto-traffic/, December 14, 2018, live, }} running from Southwest 11th Avenue in downtown Portland to just east of Cleveland Avenue in Gresham, were produced by Wilbur Smith Associates.{{sfn|Selinger|2019|page=31}} The project estimated a budget of $225.5 million (equivalent to ${{Format price|{{Inflation|US-GDP|225500000|1981}}}} in {{Inflation-year|US-GDP}} dollars), of which $146.9 million went to light rail.{{rp|8}} Planners selected the Steel Bridge to carry the alignment over the Willamette River because it had been designed for the use of the city’s former streetcars.{{rp|26}} In the east side, planners routed the line through a former Mount Hood Company interurban right-of-way, which occupied the median of East Burnside Street between 99th Avenue in Portland and Ruby Junction/197th Avenue, along which interurban service had ended in 1927.NEWS, Wilkins, Van, Portland’s MAX, Spring 1995, The New Electric Railway Journal, 12–18, 1048-3845, {{rp|13}}WEB,www.oregonmetro.gov/sites/default/files/2014/04/16/walk_there_gresham_downtown.pdf, Gresham: Downtown, Metro, April 16, 2014, September 2, 2019,web.archive.org/web/20181128211023/https://www.oregonmetro.gov/sites/default/files/2014/04/16/walk_there_gresham_downtown.pdf, November 28, 2018, live, From Ruby Junction to Cleveland Avenue, planners assumed acquisition of a two-mile (3.2 km) section owned by the Portland Traction Company (PTC).NEWS, Federman, Stan, Tri-Met acquires rail right-of-way, The Oregonian, December 17, 1983, D9, In August 1983, PTC agreed to surrender this segment as part of a longer abandonment up to Linnemann Junction,NEWS, Public Notices; Portland Traction Company, Docket No. AB-225 (Sub-No. 1)F, Notice of intent to abandon and discontinue Service, The Oregonian, August 17, 1983, 4, a total of {{convert|4.3|mi|km|adj=off}} of right-of-way, which TriMet bought for $2.9 million in December of that year. Anticipating 42,500 riders by 1990,{{rp|11}} TriMet purchased 26 light rail vehicles from Bombardier, with each car costing $750,000.NEWS, Running, Jim, Light-rail line nerve center taking shape for arrival of first car, The Oregonian, October 18, 1983, ME1, Bombardier started their production in 1982 and began delivering them in 1984.NEWS, McConnell, Pete, Trollies’ late arrival won’t delay light rail, The Oregonian, November 16, 1982, East Metro, ME1, NEWS, First car for light rail delivered, April 11, 1984, The Oregonian, C4, Zimmer Gunsul Frasca designed the line’s stations and overpasses, earning the firm a Progressive Architecture Award in 1984.MAGAZINE, Murphy, Jim, Portland transit system inaugurated, Progressive Architecture, 67, November 1986, 25, File:1985 redecking work, Steel Bridge, Portland.jpg|thumb|upright=1.1|right|alt=Photograph showing a lattice of steel girders on the Glisan Street ramp of the 1912 Steel Bridge, in Portland as redecking work is under way| Redecking work on the Glisan Street ramp of the Steel BridgeSteel BridgeThe groundbreaking ceremony took place at Ruby Junction Yard, which would house a {{convert|98000|sqft|m2|adj=on}} maintenance and operations building, in March 1982.NEWS, Thompson, Richard, Summer 1982, Portland Light Rail,oregontrolley.com/transfer/archive/documents/1982/TPN_Summer_1982.pdf, The Trolley Park News, 5, Oregon Electric Railway Historical Society, July 27, 2018,oregontrolley.com/transfer/archive/documents/1982/TPN_Summer_1982.pdf," title="web.archive.org/web/20180730235431oregontrolley.com/transfer/archive/documents/1982/TPN_Summer_1982.pdf,">web.archive.org/web/20180730235431oregontrolley.com/transfer/archive/documents/1982/TPN_Summer_1982.pdf, July 30, 2018, live, NEWS, Federman, Stan, At ground-breaking: Festivities herald transitway, The Oregonian, March 27, 1982, A12, Light rail construction, which progressed largely east to west, commenced the following year in April, on the two-mile (3.2 km) section between Ruby Junction and Cleveland Avenue.NEWS, Federman, Stan, Tri-Met opens bids on first light-rail track work, The Oregonian, March 11, 1983, B1, NEWS, Federman, Stan, Light-rail work gets go-ahead, The Oregonian, March 31, 1983, D16, The Ruby Junction facility opened as the system’s first maintenance complex later that July.NEWS, Johnson, Sara, Operations center forms heart of MAX system, The Oregonian, September 4, 1986, 8ME, NEWS, Federman, Stan, Ruby Junction due to open in July; track work beginning, The Oregonian, June 2, 1983, C7, By January 1984, work had reached East Burnside Street.NEWS, Work to begin on more light rail segments, The Oregonian, January 4, 1984, B4, To minimize the cost of the Banfield Freeway segment, track right-of-way excavation and freeway widening took place simultaneously.NEWS, Federman, Stan, ‘Big, bad Banfield’ work shifts into high gear, The Oregonian, April 27, 1983, B12, Construction along this segment nonetheless slowed due to late material deliveries, particularly between Northeast Union and 39th avenues.NEWS, Federman, Stan, After miles of frustration, construction ends under budget, The Oregonian, September 5, 1986, T9, Track work in downtown Portland, the final section to be built, began in March 1984 and involved utility relocation, cobblestone paving, and tree planting across 36 downtown blocks.NEWS, Light-rail work [photo and caption only], The Oregonian, March 10, 1984, Ralph L. Mowatt, a welder for Portland General Electric Co., cuts iron beam in street at Southwest First Avenue and Morrison Street on Friday as construction on the Banfield light-rail project moved downtown this week with utilities beginning to relocate lines., C1, NEWS, Federman, Stan, Light rail’s jolly trolley progress on track, The Oregonian, March 4, 1986, B5, The line’s use of the Steel Bridge necessitated a $10 million rehabilitation that started the following June.NEWS, Steel Bridge shut down for light rail, June 12, 1984, The Oregonian, B1, System testing followed the completion of electrification work. This included the validation of the new light rail cars, which initially encountered electrical braking glitches, by putting each of them through {{convert|1500|mi|km}} of on-track testing.NEWS, Federman, Stan, End in sight for light rail’s ‘breakdowns’, The Oregonian, April 7, 1986, B2, On July 28, 1986, an eastbound car conducting a test run struck and killed a man who had trespassed onto the light rail tracks near Northeast 68th Avenue.NEWS, Hallman, Tom Jr., Light-rail car strikes, kills man, The Oregonian, July 30, 1986, B2, The Steel Bridge reopened in May 1986 after encountering a nine-month delay caused by structural problems and late deliveries. The bridge’s owners—the Union Pacific and Southern Pacific railroads—added to the delay by insisting on the replacement of the bridge’s 64 lift cables, which TriMet claimed had not been in the original contract.NEWS, Federman, Stan, Light-rail decision planned for May 15; system opening depends on status of Steel Bridge work, The Oregonian, April 14, 1986, B8, NEWS, Federman, Stan, May 30, 1986, Bridge party trumpets reopening, The Oregonian, E2,

Inauguration and later improvements

File:TriMet Bombardier LRV and wheelchair lift at 1st and Stark in 1987.jpg|thumb|upright=1.1|left|alt=see caption|A MAX car stopped at Oak Street station in 1987]]On September 5, 1986, the $214 million (equivalent to ${{Format price|{{Inflation|US-GDP|214000000|1986}}}} in {{Inflation-year|US-GDP}} dollars) light rail line—now called Metropolitan Area Express (MAX)—opened for service.NEWS, Federman, Stan, All aboard! MAX on track; ride free, The Oregonian, September 5, 1986, 1, Its new name was selected through a public contest held by The Oregonian and TriMet in June 1986.NEWS, Name That Train Contest, The Oregonian, June 30, 1986, A8, TriMet designer Jeff Frane, who attributed inspiration to his son Alex, made the winning suggestion.WEB,trimet.org/max/25years.htm, TriMet: Celebrating 25 Years of MAX Blue Line to Gresham, TriMet,web.archive.org/web/20170714071627/https://trimet.org/max/25years.htm, July 14, 2017, July 27, 2018, As the planning of an extension to the west side progressed, this line came to be referred to as the Eastside MAX. Freeway transfer funds provided $178.3 million, or 83 percent of the total cost. The project was completed $10 million under budget. An estimated 250,000 people attended the opening celebrations which spanned three days. Downtown retailers, many of whom had opposed light rail, reported substantial increases in sales following the line’s opening.NEWS, McCloud, John, National Notebook: Portland, Ore.; Where MAX Is the Most, The New York Times, December 28, 1986, Nine new bus lines were created and six existing bus routes were modified as feeder routes.NEWS, Wade, Michael, New bus routes to feed light-rail stations, The Oregonian, September 4, 1986, 8ME, MAX trains initially operated between 5:00 am and 1:30 am, with headways as short as seven minutes. Fares ranged $0.85–$1.30 to travel up to four paid zones.NEWS, Federman, Stan, Going to the MAX: Your ticket to light rail, The Oregonian, September 5, 1986, T10, Rides were free within Fareless Square from opening day until 2012.NEWS, At last, here’s your chance to jump all over Tri-Met, The Oregonian, August 24, 1986, A20, NEWS, Rose, Joseph, TriMet board kills Portland’s Free Rail Zone, raises fares, cuts bus service over protesters’ shouts, jeers, June 13, 2012, The Oregonian,blog.oregonlive.com/commuting/2012/06/trimet_board_kills_portlands_f.html, July 17, 2012,blog.oregonlive.com/commuting/2012/06/trimet_board_kills_portlands_f.html," title="web.archive.org/web/20120615213600blog.oregonlive.com/commuting/2012/06/trimet_board_kills_portlands_f.html,">web.archive.org/web/20120615213600blog.oregonlive.com/commuting/2012/06/trimet_board_kills_portlands_f.html, June 15, 2012, Originally, MAX trains did not automatically stop at every station, if no one was waiting to board when a train approached a given stop. MAX cars were equipped with stop-request bell cords (as are commonly found on American transit buses), which passengers needed to pull to signal the operator that they wanted to get off at the next stop. However, after finding that the times when a train could pass a station without needing to stop{{spaced endash}}because no one was getting on or off{{spaced endash}}were mainly limited to late-night hours and a small number of less-used stations, TriMet removed the bell cords in November 1994 and changed its operating practices to have trains stop at every station at all times.NEWS, World News [regular news section], Light Rail and Modern Tramway, Ian Allan Publishing, December 1994, 331, 0964-9255, (File:Gresham Central MAX station in 1989 with outbound train arriving.jpg|thumb|upright=1.1|right|alt=Photograph of Greshan Central Station showing a train with the station platform in the background|Gresham Central station in 1989, when the line section on which it is located was still single-track)From 1986 to 1996, most of the line’s easternmost two miles (3.2 km), beyond the Ruby Junction maintenance facility, operated as bidirectional single-track.BOOK, Special Report 221 – Light Rail Transit: New System Successes at Affordable Prices,onlinepubs.trb.org/Onlinepubs/sr/sr221/221.pdf, Transportation Research Board, 1989, 0-309-04713-7, 25, 34, 90, 92, 317, 319, 468, May 6, 2019,onlinepubs.trb.org/Onlinepubs/sr/sr221/221.pdf," title="web.archive.org/web/20180710103622onlinepubs.trb.org/Onlinepubs/sr/sr221/221.pdf,">web.archive.org/web/20180710103622onlinepubs.trb.org/Onlinepubs/sr/sr221/221.pdf, July 10, 2018, live, {{rp|319–320}}NEWS, Kunz, Richard, Portland: MAX-imum effort, Passenger Train Journal, December 1986, 14–16, 0160-6913, Trains traveling in opposite directions were unable to pass in these sections, resulting in delays when service ran behind schedule. In early 1996, a second track was laid and a second platform was constructed at Gresham Central Transit Center,NEWS, Chen, Stanford, MAX line will reopen 4 stations in Gresham: After three months of work on double-tracking, the new light-rail service is touted as an improvement, with more trains and less waiting, The Oregonian, May 10, 1996, making the section double-track and eliminating the only remaining single-track on the Eastside MAX.NEWS, World News Review [regular news section], Light Rail and Modern Tramway, Ian Allan Publishing, July 1996, 274, 0964-9255, The new track was brought into use in May after a three-month suspension of MAX service east of Rockwood/East 188th Avenue station; it had been replaced by shuttle buses to allow the work to be carried out.NEWS, Construction will close 4 Gresham MAX stations, The Oregonian, February 16, 1996, Since the inauguration of MAX, TriMet has added four infill stations to the original alignment. In March 1990, the system opened the Mall stations—their names referring to the Portland Transit Mall—to coincide with the opening of Pioneer Place shopping mall in downtown Portland.NEWS, Arriving with a smash (photo and caption only), The Oregonian, March 27, 1990, A Metropolitan Area Express train breaks through a banner Monday afternoon marking the opening of a new light-rail station in front of Pioneer Place..., After operating for 30 years, these stations closed permanently in March 2020, owing to low ridership and to speed up train travel times across the city center.NEWS, Theen, Andrew,www.oregonlive.com/commuting/2020/02/2-downtown-max-stations-close-permanently-next-week-changes-coming-more-than-a-dozen-trimet-bus-routes.html, 2 downtown MAX stations close permanently next week; changes coming to more than a dozen TriMet bus routes, February 25, 2020, The Oregonian, March 9, 2020, March 9, 2020,web.archive.org/web/20200309011757/https://www.oregonlive.com/commuting/2020/02/2-downtown-max-stations-close-permanently-next-week-changes-coming-more-than-a-dozen-trimet-bus-routes.html, live, In September 1990, the Oregon Convention Center opened to the public with MAX service from Convention Center station.NEWS, Kirchmeier, Mark, 3-year-old MAX near turning point, The Oregonian, September 29, 1989, E10, Work on the line’s newest station, {{stn|Civic Drive}}, started in 1997 as part of the Civic neighborhood development,NEWS, Briggs, Kara, Winmar prepares to start project, The Oregonian, May 15, 1996, B2, but was delayed for approximately twelve years due to a lack of funding. Construction resumed in May 2010 and the station opened on December 1, 2010.NEWS, No. 85! TriMet breaks ground on new MAX station, TriMet, May 17, 2010,trimet.org/news/releases/2010/may17-civicdrive.htm,trimet.org/news/releases/2010/may17-civicdrive.htm," title="web.archive.org/web/20101202103058trimet.org/news/releases/2010/may17-civicdrive.htm,">web.archive.org/web/20101202103058trimet.org/news/releases/2010/may17-civicdrive.htm, December 2, 2010, unfit, January 23, 2019, NEWS, Rose, Joseph, Buxton, Matt, Beaven, Stephen, New MAX station opens at Civic Drive On Wednesday, The Oregonian, December 4, 2010, In 2015, TriMet began renovating fourteen of the system’s oldest stations, between Hollywood/Northeast 42nd Avenue Transit Center and Cleveland Avenue. The project includes the installation of new windscreens, shelter roofs, digital information displays, lighting, and security cameras. Three stations—{{stn|Gresham City Hall}}, {{stn|East 122nd Avenue}}, and {{stn|East 162nd Avenue}}—have been renovated as of February 2019.WEB,trimet.org/bettertransit/bluelineupgrades.htm, Renovating MAX Blue Line Stations and Crossings, TriMet, February 11, 2019,web.archive.org/web/20190212072928/https://trimet.org/bettertransit/bluelineupgrades.htm, February 12, 2019,

Westside extension

Early planning and delays

{{seealso|Forest Grove branch#History}}(File:VIEW OF RAILWAY CORRIDOR FROM 185TH AVENUE, FACING EAST - Oregon Electric Railway Westside Corridor, Hillsboro Extension, Between 185th Avenue and Hillsboro, Beaverton, HAER ORE,34-BEAV,1A-1.tif|thumb|upright=1.1|left|alt= Photograph of a single railway line crossing a road | The former-OE railway crossing on 185th Avenue in 1995, prior to the start of construction)On September 30, 1908, an interurban rail service ran for the first time between Portland and Hillsboro.BOOK, Thompson, Richard, Willamette Valley Railways, January 1, 2008,books.google.com/books?id=G42lB3U1aQUC&pg=PA29, Arcadia Publishing, 978-0738556017, May 29, 2019, February 3, 2021,web.archive.org/web/20210203224009/https://books.google.com/books?id=G42lB3U1aQUC&pg=PA29, live, {{rp|31}} It was operated by the Oregon Electric Railway (OE), which built a branch line from its Garden Home depot to Forest Grove.WEB,www.oregon.gov/oprd/HCD/SHPO/docs/HillsboroOrencoWalkingTour2013.pdf, Historic Hillsboro Old Orenco Walking Map, Hillsboro, Oregon, City of Hillsboro, 2013, January 8, 2019,web.archive.org/web/20190108212849/https://www.oregon.gov/oprd/HCD/SHPO/docs/HillsboroOrencoWalkingTour2013.pdf, January 8, 2019, The Great Depression and the rise of the automobile in the 1920s led to the closure of the Forest Grove Branch in 1932.{{rp|29}} The Burlington Northern Railroad (BN) later acquired much of this alignment and used it for freight service. It abandoned a segment between Orenco and central Hillsboro in 1977.REPORT, 1994, Hillsboro Extension of the Westside Corridor Project, Washington County: Environmental Impact Statement, Federal Transit Administration, P1–P5,books.google.com/books?id=ih03AQAAMAAJ, July 29, 2018, {{rp|3–32}}In 1979, plans to restore passenger rail service from Portland to the west side emerged with a proposal to extend MAX to 185th Avenue, near the Hillsboro–Beaverton boundary.WEB,tile.loc.gov/storage-services/master/pnp/habshaer/or/or0300/or0330/data/or0330data.pdf, Oregon Electric Railway Westside Corridor (Burlington Northern Railroad Westside Corridor), Keeler, Robert W., August 1993, Historic American Engineering Record, Library of Congress, Washington, D.C., December 17, 2022, December 17, 2022,web.archive.org/web/20221217224913/https://tile.loc.gov/storage-services/master/pnp/habshaer/or/or0300/or0330/data/or0330data.pdf, live, {{rp|2}}{{rp|2–1}} In 1983, Metro (the successor to CRAG) selected light rail as the preferred mode alternative, and the Urban Mass Transportation Administration (UMTA) released $1.3 million to begin a preliminary engineering study.{{rp|2–2}}NEWS, Federman, Stan, Tri-Met heats up study for westside light rail, The Oregonian, November 7, 1987, E14, That same year, newly appointed Hillsboro Mayor Shirley Huffman began lobbying for the line’s extension to downtown Hillsboro. She traveled frequently to Washington, D.C. to lobby Congress and UMTA.NEWS, Hamilton, Don, Shirley Huffman, fiery lobbyist, earns praise; hard work and a sharp phone call put light-rail trains into downtown Hillsboro, The Oregonian, February 23, 2000, E2, The project was later suspended by TriMet amid conflict with UMTA, who wanted the former to develop a financing plan before it released funding for preliminary engineering work.NEWS, Federman, Stan, Goldschmidt appoints two to Tri-Met’s board, September 26, 1987, The Oregonian, B2,infoweb.newsbank.com/apps/news/document-view?p=EANX-NB&docref=image%2Fv2%3A11A73E5827618330%40EANX-NB-13298BCA5087A09C%402447065-1328D7C4559523CD%4018-1328D7C4559523CD%40, April 8, 2022, registration, NewsBank, July 31, 2022,web.archive.org/web/20220731220544/https://infoweb.newsbank.com/apps/news/user/login?destination=document-view%3Fp%3DEANX-NB%26docref%3Dimage/v2%253A11A73E5827618330%2540EANX-NB-13298BCA5087A09C%25402447065-1328D7C4559523CD%254018-1328D7C4559523CD%2540, live, By the time planning resumed in January 1988,WEB,trimet.org/pdfs/history/railfactsheet-westside.pdf, Westside MAX: Blue Line Extension Fact Sheet, TriMet, August 2012, July 30, 2018,trimet.org/pdfs/history/railfactsheet-westside.pdf," title="web.archive.org/web/20160610172633trimet.org/pdfs/history/railfactsheet-westside.pdf,">web.archive.org/web/20160610172633trimet.org/pdfs/history/railfactsheet-westside.pdf, June 10, 2016, dead, significant changes in the Westside Corridor, including the conversion of {{convert|3,000|acre|ha|0}} of vacant Washington County land into mixed-use urban areas, required a re-evaluation that was completed in May 1991.{{rp|2–2}}NEWS, Ostergren, Jack, Light-rail panel surveys options for westside corridor, The Oregonian, September 22, 1988, C4, As planning continued on the route between Portland and 185th Avenue, alternative routes through Beaverton included alignments along the Sunset Highway (U.S. 26), the BN right-of-way, and the Tualatin Valley Highway (TV Highway). A consultant recommended the BN alternative to TriMet in December 1988,NEWS, Federman, Stan, Consultant picks route for light rail, The Oregonian, December 15, 1988, A1, and the agency’s board ultimately selected that recommendation.NEWS, Manzano, Phil, Westside light rail route OK’d, The Oregonian, February 23, 1989, C2, NEWS, Bodine, Harry, Timetable puts westside light-rail service 8 years away, The Oregonian, West Metro, September 22, 1989, D2, The terminus station would have been along the BN right-of-way near 185th Avenue and Baseline Road. Meanwhile, the Portland City Council formed an advisory committee to determine whether the route through downtown should extend west from 11th Avenue on Southwest Morrison and Yamhill streets or run through the Portland Transit Mall on 5th and 6th avenues.NEWS, Oliver, Gordon, Panel eyes downtown link with westside light-rail line, The Oregonian, February 21, 1989, B2, The locally preferred alternative ultimately adopted a continuation of MAX along Morrison and Yamhill streets.REPORT,books.google.com/books?id=WNc3AQAAMAAJ, 2–5, 2–9, Westside Corridor Project, Multnomah/Washington Counties (Portland): Final Environmental Impact Statement, Urban Mass Transportation Administration, August 1991, March 22, 2020, July 31, 2022,web.archive.org/web/20220731220543/https://books.google.com/books?id=WNc3AQAAMAAJ, live, The efforts of Huffman and others regarding the proposed Hillsboro extension led to a supplemental study in April 1993, which evaluated options to extend the westside light rail project, among other mode alternatives,{{rp|2–4}} to the Washington County Fairplex or downtown Hillsboro.{{rp|S–14}}NEWS, Oliver, Gordon, Tri-Met approves rail line extension, The Oregonian, July 29, 1993, F4, Alternative routes up to downtown Hillsboro included the abandoned BN segment from 185th Avenue to 10th Avenue, Baseline and Cornell roads, and TV Highway.{{rp|2–4}} In July of that year, TriMet approved an extension of the initial {{convert|11.5|mi|km|0|adj=on}} light rail line, {{convert|6.2|mi|km|0}} farther west to downtown Hillsboro using the abandoned BN route.WEB,www.transit.dot.gov/regulations-and-guidance/creation-and-benefits-positive-public-relations, Creation and Benefits of Positive Public Relations, Federal Transit Administration, February 5, 1996, May 6, 2019,web.archive.org/web/20190506103550/https://www.transit.dot.gov/regulations-and-guidance/creation-and-benefits-positive-public-relations, May 6, 2019, live, BOOK, Sebree, Mac, Mac Sebree, 1994, Portland’s Westside Tunnel: An LRT Breakthrough, 1994 Light Rail Annual & User’s Guide, North American Light Rail Annual and User’s Guide for, 10–14, Pasadena, CA, Pentrex, 0160-6913, {{efn|name=rounding}} This brought the project’s new total distance to {{convert|17.7|mi|km}} (some sources say 17.5 km).{{efn|name=rounding}} At the time, the line was scheduled to open as far as 185th Avenue in September 1997,NEWS, Bella, Rick, Westside light-rail work begins, The Oregonian, August 13, 1993, C1, {{rp|R2}} and downtown Hillsboro by the end of 1998.

Funding and construction

(File:MAX Tunnel Entrance.jpg|thumb|upright=1.1|right|alt= Photograph of a railway tunnel |East portal of the Robertson Tunnel in Portland’s Goose Hollow neighborhood)Funding for the westside extension proved difficult to obtain under the Reagan Administration, which sought to reduce federal expenditures by delaying existing light rail projects and declining to approve future planning.{{sfn|Selinger|2019|page=69}} As members of their respective appropriations committees, U.S. Senator Mark Hatfield and U.S. Representative Les AuCoin secured preliminary engineering and environmental review grants in 1989 by withholding funds from the head of UMTA’s office.{{sfn|Selinger|2019|page=69–70}}NEWS, Oregon gets its pork, but Washington fattens up, Larry, Swisher, The Register-Guard, Eugene, Oregon, Eugene, December 12, 1989,news.google.com/newspapers?id=920VAAAAIBAJ&sjid=reEDAAAAIBAJ&pg=2158%2C3390173, October 8, 2009, July 31, 2022,web.archive.org/web/20220731220543/https://news.google.com/newspapers?id=920VAAAAIBAJ&sjid=reEDAAAAIBAJ&pg=2158%2C3390173, live, In 1990, Congress adopted legislation requiring the federal government to cover a 75 percent share of transit projects approved within the fiscal year.NEWS, Mayer, James, Ballot Measure 1 holds key to light-rail plan, The Oregonian, May 9, 1990, B4, Voters subsequently rejected a measure to permit the use of local vehicle registration fees for public transit, which would have covered Oregon’s 25 percent share, defeating it 52 percent to 48 percent.NEWS, Mayer, James, Westside light-rail backers reel after vote, The Oregonian, May 18, 1990, D5, With a year-end deadline approaching the 25 percent local-share stipulation, TriMet introduced a $125 million local bond measure in July 1990.NEWS, Mayer, James, Tri-Met directors decide to seek light-rail bonds, The Oregonian, July 26, 1990, A1, Portland area voters overwhelmingly approved the ballot measure, which earned 74 percent average approval the following November. This marked the region’s first successful vote approving public transportation.NEWS, Mayer, James, Light-rail bond approved, but Tri-Met worries not over, The Oregonian, November 8, 1990, C4, {{sfn|Selinger|2019|page=70}} The Federal Transit Administration (the new name for UMTA) completed the funding package in 1991, granting $515 million to build the line up to 185th Avenue. It provided another $75 million in 1994 following the approval of the Hillsboro extension, which covered one-third of the segment’s $224 million additional cost.NEWS, Oliver, Gordon, Light-rail extension wins Clinton’s support, The Oregonian, November 8, 1994, B8, {{sfn|Selinger|2019|page=70}}Construction of the Westside MAX began in August 1993 with the excavation of the {{convert|21|ft|m|adj=mid|-diameter}} Robertson Tunnel.NEWS, Oliver, Gordon, Groundbreaking ceremonies set to launch project, The Sunday Oregonian, August 8, 1993, “Westside Light Rail: Making Tracks” (special section), p. R1–R2, Several alternative alignments through the West Hills were studied, including an all-surface option along the Sunset Highway, an option with a half-mile-long (0.8{{nbsp}}km) “short tunnel”, and an option with a {{convert|3|mi|km|adj=on}} “long tunnel”.NEWS, Kirchmeier, Mark, Tri-Met picks Goose Hollow for MAX route, The Oregonian, January 27, 1989, E4, NEWS, Mayer, James, Revised westside light-rail options run to $496 million, The Oregonian, January 25, 1990, C3, TriMet chose the “long tunnel” in April 1991.NEWS, Mayer, James, Board picks light-rail tunnel, The Oregonian, April 13, 1991, 1, Frontier-Traylor, the project’s general contractor,MAGAZINE, American Concrete Institute, Concrete International. Design & Construction, 21, The Institute, 1999, August 15, 2018,books.google.com/books?id=cr3wAAAAIAAJ&pg=77, July 31, 2022,web.archive.org/web/20220731220543/https://books.google.com/books?id=cr3wAAAAIAAJ&pg=77, live, used conventional drilling and blasting techniques to dig through the west end. On the east segment, a {{convert|278|ft|m|0|adj=on}} tunnel boring machine was used to drill for two miles.{{sfn|Selinger|2019|page=74}} Highly fragmented rock initially made machine excavation difficult, delaying the project for nine months.{{sfn|Selinger|2019|page=74}} The $166.9 million tunnel was completed in 1997.NEWS, Oliver, Gordon, Tri-Met’s light-rail tunnel costs continue to rise, The Oregonian, August 29, 1996, B4, NEWS, Oliver, Gordon, Hamilton, Don, Go west young MAX, The Oregonian, September 9, 1998, C1, It houses the {{convert|260|ft|m|adj=mid|-deep}} Washington Park station, currently the system’s only underground station and the deepest transit station in North America.NEWS, Altstadt, Roberta, UPDATE: TriMet to replace elevators at the deepest transit station in North America, TriMet, August 2, 2019,news.trimet.org/2019/08/trimet-to-replace-elevators-at-the-deepest-transit-station-in-north-america/, August 6, 2019,news.trimet.org/2019/08/trimet-to-replace-elevators-at-the-deepest-transit-station-in-north-america/," title="web.archive.org/web/20190806230516news.trimet.org/2019/08/trimet-to-replace-elevators-at-the-deepest-transit-station-in-north-america/,">web.archive.org/web/20190806230516news.trimet.org/2019/08/trimet-to-replace-elevators-at-the-deepest-transit-station-in-north-america/, August 6, 2019, Work along Oregon Highway 217 started in March 1994.NEWS, Oliver, Gordon, Blasting the tunnels, The Oregonian, January 30, 1994, D1, Initially planned to run alongside freight trains through Beaverton and Hillsboro, the alignment was replaced with light rail following TriMet’s acquisition of the BN right-of-way in June.NEWS, Oliver, Gordon, June 23, 1994, Railroad deal provides Tri-Met with westside light-rail route, D4, The Oregonian, The {{convert|600|ft|m|adj=mid|-long}} horseshoe tunnel below Sunset Highway was completed in July 1995 and all highway work ceased in December.NEWS, Mahar, Ted, On the right track, The Oregonian, February 9, 1995, C2, Track work commenced west of 185th Avenue around the time the Elmonica Yard opened in January 1996. It was built to accommodate some of the 39 Siemens cars TriMet procured.NEWS, Colby, Richard N., Work is under way in Hillsboro preparing the way for light rail, The Oregonian, January 11, 1996, C2, NEWS, Colby, Richard N., Light-rail milestone: The $16{{nbsp, million Westside MAX maintenance building in Elmonica is dedicated by Tri-Met|work=The Oregonian |date=January 22, 1996 |edition=West Metro|page=B2}} The model SD660 low-floor cars, jointly developed by TriMet and Siemens,NEWS, Corselli, Andrew, Siemens Receives Two LRV Orders, Railway Age, July 29, 2019,www.railwayage.com/passenger/light-rail/siemens-receives-two-lrv-orders/, July 29, 2019,web.archive.org/web/20190729184455/https://www.railwayage.com/passenger/light-rail/siemens-receives-two-lrv-orders/, July 29, 2019, live, became notable as the first low-floor light rail vehicles in North America.NEWS, Oliver, Gordon, Tri-Met prepares to purchase 37 low-floor light-rail cars, The Oregonian, April 15, 1993, D4, NEWS, Oliver, Gordon, Westside light-rail costs increase, The Oregonian, July 1, 1993, C5, The final rail spike was driven on Hillsboro’s Main Street Bridge in October 1997. System testing took place in June 1998.NEWS, Hamilton, Don, Tri-Met gets ready, set for Westside MAX start-up: Every week until Sept. 12 will see drills and tests to be sure the system is in good order after 5 years, $1 billion of work, The Oregonian, June 25, 1998, 1,

Opening

(File:MAX Type 4 cars crossing 185th.JPG|thumb|right|upright=1.1|A two-car train crossing 185th Avenue and entering Hillsboro|alt=A light-rail train at an at grade crossing)Owing to delays caused by tunneling work, the line’s planned September 1997 opening up to 185th Avenue was postponed by one year.NEWS, Hamilton, Don, Tri-Met experiencing a holdup in the hills, The Oregonian, August 25, 1995, B2, The agency [Tri-Met] says digging the tunnel for westside light rail will cause a year’s delay in completing the entire project., NEWS, Oliver, Gordon, Westside rail finally looks like a reality, The Oregonian, January 6, 1997, B2, On August 31, 1997, the Westside MAX opened its first section, a two-station extension west to the Civic Stadium and Kings Hill/SW Salmon Street,NEWS, O’Keefe, Mark, New MAX cars smooth the way for wheelchairs, The Oregonian, September 1, 1997, B12, in conjunction with the entry into service of the first low-floor cars.{{sfn|Selinger|2019|page=76}} Grand opening celebrations for the entire $963.5{{nbsp}}million (equivalent to ${{Format price|{{Inflation|US-GDP|963500000|1998}}}} in {{Inflation-year|US-GDP}} dollars) line took place on September 12, 1998. Ceremonies were held at various stations and speeches were delivered by local and national dignitaries, including Vice President Al Gore.WEB,www.trimet.org:80/calendargo.htm, Celebrating the Grand Opening of Tri-Met’s Westside MAX Light Rail!, TriMet, September 11, 1998, August 14, 2018, dead,www.trimet.org/calendargo.htm," title="web.archive.org/web/19991118035405www.trimet.org/calendargo.htm,">web.archive.org/web/19991118035405www.trimet.org/calendargo.htm, November 18, 1999, Twelve TriMet bus routes, which had operated between the west side and downtown Portland, were reduced to five, replaced by light rail.NEWS, Hamilton, Don, Bus changes aim to sell commuters on using rail, The Oregonian, September 9, 1998, C5, The line immediately drew strong ridership, exceeding projections for 2005 less than two years after it opened.NEWS, Stewart, Bill, Westside MAX celebrates two years on track: The light-rail line surpasses expectations, averaging more riders daily than were projected for 2005, The Oregonian, September 13, 2000, C3, In September 2000, TriMet adopted a color coding scheme to differentiate its trains operating between Hillsboro and Gresham from those that were going to serve the Airport MAX extension, assigning the colors blue and red, respectively.NEWS, Systems News [regular news section], Tramways & Urban Transit, Ian Allan Publishing, December 2000, 471, UK, 1460-8324, With the light rail system due to expand to two services in September 2001, and three in 2004 (with all three using the same routing and stops in the city centre), Tri-Met has decided to assign route colours as follows ..., {{sfn|Selinger|2019|page=83}} The line-identification system was implemented shortly before the Red Line’s opening on September 10, 2001.NEWS, Briggs, Kara, Airport MAX light-rail service in sight, The Oregonian, August 29, 2001, C2,

Proposed extension to Forest Grove

In February 2006, local government officials proposed an extension of the Westside MAX from its Hatfield Government Center terminus to Forest Grove. City leaders approached a former TriMet engineer to conduct a feasibility study and develop a plan to get the project included in Metro’s Joint Policy Advisory Committee on Transportation list of priority projects.NEWS, Smith, Jill, Expert hired to draw up light-rail plan options, The Oregonian, February 23, 2006, 4, The six-month study, completed in October, estimated a cost of about $200 million to build the segment. The study identified a best route option using existing tracks between Southwest Adams Avenue in Hillsboro and Douglas Street in Forest Grove. The tracks, which were formerly owned by OE, are currently state-owned with operating rights assigned to the Portland and Western Railroad.NEWS, Smith, Jill, The early line on light rail, The Oregonian, November 2, 2006, 14, Metro proposes a high-capacity transit extension to Forest Grove as part of its 2018 Regional Transportation Plan for 2040 but does not specify the type of high-capacity transit, which could either be a bus or a rail option.REPORT, Public Review Draft, 2018 Regional Transportation Plan, Chapter 6: Regional Programs and Projects to Achieve Our Vision,www.oregonmetro.gov/sites/default/files/2018/06/29/RTP_Ch6_Investment_Prioritiespublicreview.pdf, 15, 19, June 29, 2018, Metro, April 23, 2019,web.archive.org/web/20190423163603/https://www.oregonmetro.gov/sites/default/files/2018/06/29/RTP_Ch6_Investment_Prioritiespublicreview.pdf, April 23, 2019, live,

Route

(File:Hollywood Exit (Banfield West).jpg|thumb|upright=1.1|right|A section of the light rail tracks next to the Banfield Freeway|alt=Photograph of a section of rail tracks next to a freeway exit ramp with busy a six-lane freeway to the left)(File:Sunset Highway in Portland with MAX train adjacent (2015).jpg|thumb|upright=1.1|right|A MAX train next to the Sunset Highway, east of Sunset Transit Center|alt=Photograph of a train running next to a busy freeway on the right)The Blue Line operates along the Eastside and Westside MAX segments, which combined total {{convert|32.6|mi|km|1}}JOURNAL, Portland LRT: The Beat Goes On,onlinepubs.trb.org/onlinepubs/lrtnews/LRTv20n1.pdf, LRT News, Transportation Research Board, April 2008, 20, 1, 0162-8429, 4, 2019-05-06,onlinepubs.trb.org/Onlinepubs/lrtnews/LRTv20n1.pdf," title="web.archive.org/web/20120312070223onlinepubs.trb.org/Onlinepubs/lrtnews/LRTv20n1.pdf,">web.archive.org/web/20120312070223onlinepubs.trb.org/Onlinepubs/lrtnews/LRTv20n1.pdf, 2012-03-12, live, {{efn|name=rounding}} to {{convert|32.7|mi|km|1}}.NEWS, Morgan, Steve, US Vice-President Gore launches Portland’s new Westside route, November 1998, Tramways & Urban Transit, UK, Ian Allan Publishing, 1460-8324, BOOK, Webb, Mary, Jane’s Urban Transport Systems 2007–2008, 2007, Jane’s Information Group, Coulsdon, Surrey, UK, 978-0-7106-2816-9, 460,books.google.com/books?id=oo5UAAAAMAAJ&q=%2252.6+km%22, May 6, 2019, July 31, 2022,web.archive.org/web/20220731220544/https://books.google.com/books?id=oo5UAAAAMAAJ&dq=Portland+%22Blue+Line%22+%22light+rail%22++%2252.6+km%22&focus=searchwithinvolume&q=%2252.6+km%22, live, {{efn|name=rounding}} Its western terminus is {{stn|Hatfield Government Center}} in Hillsboro, on the corner of West Main Street and Southwest Adams Avenue.WEB,trimet.org/ride/stop.html?stop_id=9848, Stop ID 9848 – Hatfield Government Center MAX Station, Southbound, TriMet, September 7, 2018,web.archive.org/web/20190210193251/https://trimet.org/ride/stop.html?stop_id=9848, February 10, 2019, From there, the line heads east along the median of Southeast Washington Street and continues east on a former BN—former OE—right-of-way between Southeast 10th Avenue and Northwest 185th Avenue,WEB,trimet.org/ride/stop.html?stop_id=9843, Stop ID 9843 – Tuality Hospital/SE 8th Ave MAX Station, Eastbound, TriMet, February 8, 2019,web.archive.org/web/20190210193347/https://trimet.org/ride/stop.html?stop_id=9843, February 10, 2019, traveling mostly at-grade except at grade-separated crossings—notably, the Main Street Bridge and Cornelius Pass Road—until it reaches Beaverton Transit Center.{{rp|11}} It then turns north, running adjacent to Oregon Highway 217 to Sunset Transit Center. From there it continues eastwards along the north side of the Sunset Highway before entering the Robertson Tunnel for Washington Park station. After leaving the tunnel, the line passes below the Vista Bridge and enters downtown Portland, continuing along Southwest Jefferson Street before turning north onto the median of Southwest 18th Avenue.WEB,trimet.org/ride/stop.html?stop_id=10118, Stop ID 10118 – Goose Hollow/SW Jefferson St MAX Station, Eastbound, TriMet, September 7, 2018,web.archive.org/web/20190210193425/https://trimet.org/ride/stop.html?stop_id=10118, February 10, 2019, Near Providence Park, the tracks diverge eastbound onto Southwest Yamhill Street and westbound onto Southwest Morrison Street,WEB,trimet.org/ride/stop.html?stop_id=9758, Stop ID 9758 – Providence Park MAX Station, Eastbound, TriMet, February 8, 2019,web.archive.org/web/20190210193500/https://trimet.org/ride/stop.html?stop_id=9758, February 10, 2019, crossing the Portland Transit Mall near the Pioneer Courthouse and Pioneer Courthouse Square.WEB,trimet.org/ride/stop.html?stop_id=8334, Stop ID 8334 – Pioneer Square South MAX Station, Eastbound, TriMet, February 8, 2019,web.archive.org/web/20190210193850/https://trimet.org/ride/stop.html?stop_id=8334, February 10, 2019, The tracks reconnect on Southwest 1st Avenue and head north, traversing the Willamette River via the Steel Bridge into the Rose Quarter. The line runs along Holladay Street in the Rose Quarter and the Lloyd District, passing the Moda Center and the Oregon Convention Center.MAP,trimet.org/maps/pdf/citycenter.pdf, Portland City Center and Transit Mall map, TriMet, July 26, 2018,web.archive.org/web/20190210193921/https://trimet.org/maps/pdf/citycenter.pdf, February 10, 2019, It enters its grade-separated segment along the north bank of the Banfield Freeway at Sullivan’s Gulch.WEB,trimet.org/ride/stop.html?stop_id=8343, Stop ID 8343 – Lloyd Center/NE 11th Ave MAX Station, Eastbound, TriMet, September 7, 2018,web.archive.org/web/20190210193956/https://trimet.org/ride/stop.html?stop_id=8343, February 10, 2019, The line then travels over the Interstate 84 and Interstate 205 interchange towards Gateway/Northeast 99th Avenue Transit Center.WEB,trimet.org/ride/stop.html?stop_id=8347, Stop ID 8347 – Gateway/NE 99th Ave TC MAX Station, Southbound, TriMet, September 7, 2018,web.archive.org/web/20190210194030/https://trimet.org/ride/stop.html?stop_id=8347, February 10, 2019, From Gateway Transit Center, tracks head south along the east side of I-205. A single-track junction south of Gateway Transit Center marks the start of the Airport MAX segment while a double junction south of Southeast Glisan Street splits into the I-205 MAX. The Blue Line turns east and enters the median of East Burnside Street at East 97th Avenue.MAP,trimet.org/maps/pdf/trimetsystem.pdf, TriMet System map, TriMet, July 25, 2018,web.archive.org/web/20190210194105/https://trimet.org/maps/pdf/trimetsystem.pdf, February 10, 2019, At Ruby Junction/East 197th Avenue station, the line leaves the street and heads southeastwards until it reaches Cleveland Avenue station, its last stop, near the corner of Northeast Cleveland Avenue and Northeast 8th Street in Gresham.The Blue Line shares much of its alignment with the Red Line. Between 2001 and 2003, they used the same tracks from the 11th Avenue loop tracks in downtown Portland to Gateway Transit Center, where Red Line trains diverge towards Portland International Airport.WEB,i2.wp.com/www.transitmap.net/wp-content/uploads/2014/10/tumblr_ndva2tj8Oi1r54c4oo1_1280.jpg, MAX Light Rail System, 2001, TriMet, Transit Maps, September 1, 2018,web.archive.org/web/20190523163112/https://i2.wp.com/www.transitmap.net/wp-content/uploads/2014/10/tumblr_ndva2tj8Oi1r54c4oo1_1280.jpg, May 23, 2019, Since 2003, they have shared the same route between Beaverton Transit Center and Gateway Transit Center.NEWS, Leeson, Fred, August 27, 2003, MAX fares increase, direct service from Beaverton to PDX starts, The Oregonian, D2, The Green Line joined a part of this shared alignment in 2009, entering from the Portland Transit Mall just west of the Steel Bridge, diverging at Gateway Transit Center, and continuing south towards Clackamas.NEWS, Pantell, Susan, Portland: New Green Line Light Rail Extension Opens, Light Rail Now, December 2009,www.lightrailnow.org/news/n_por_2009-12a.htm,www.lightrailnow.org/news/n_por_2009-12a.htm," title="web.archive.org/web/20180809090746www.lightrailnow.org/news/n_por_2009-12a.htm,">web.archive.org/web/20180809090746www.lightrailnow.org/news/n_por_2009-12a.htm, August 9, 2018, September 1, 2018, {{maplink|frame=yes|frame-align=center|frame-width=900|frame-height=420|frame-lat=45.516|frame-long=-122.71|zoom=11|type=line|raw={{Pseudopedia:Map data/Pseudopedia KML/MAX Light Rail/Blue Line}}|text=A geographic map of the MAX Blue Line (in red) relative to the rest of the network (in black) with icons marking the line’s termini. The official system schematic can be viewed on the TriMet website.}}

Stations

{{Further|topic=the stations, including TriMet bus connections|List of MAX Light Rail stations}}(File:Hillsboro (55249008).jpg|thumb|upright=1.1|right|Hatfield Government Center station, the Blue Line’s western terminus|alt=Photograph of a train station with two trains at its platforms with a road to the right)(File:Two trains at Cleveland Avenue station, February 2018.JPG|thumb|upright=1.1|right|Cleveland Avenue station, the Blue Line’s eastern terminus|alt=Photograph of a train station with a platform running down the middle and a train on either side)The Blue Line serves 48 stations. The 27 stations built as part of the inaugural line between Gresham and downtown Portland opened on September 5, 1986.{{rp|37}} The Mall stations on Southwest 4th and 5th avenues were added in conjunction with the opening of Pioneer Place in March 1990,BOOK, Schneider, Joachim, Public Private Partnership for Urban Rail Transit: Forms, regulatory conditions, participants, Springer Science & Business Media, 2012, 978-3322817082, 343,books.google.com/books?id=uV_2BwAAQBAJ&pg=PA343, August 22, 2018, July 31, 2022,web.archive.org/web/20220731220544/https://books.google.com/books?id=uV_2BwAAQBAJ&pg=PA343, live, followed by the Convention Center station and the Oregon Convention Center in September.NEWS, Mayer, James, Dedication kicks off Convention Center fete, The Oregonian, September 20, 1990, A1, The Westside MAX opened in two stages due to delays in construction. The first two stations, Civic Stadium—now {{stn|Providence Park}}—and Kings Hill/Southwest Salmon Street opened on August 31, 1997.NEWS, Oliver, Gordon, Hamilton, Don, MAX moves west new rail stations will go on-line, The Oregonian, August 29, 1997, A1, The remaining 18 stations opened during the segment’s inauguration on September 12, 1998. The newest station is Civic Drive, which was opened on December 1, 2010.WEB, TriMet, Eastside Revitalization Report,trimet.org/pdfs/projects/eastside_revitalization_report.pdf, April 2010, August 17, 2009,trimet.org/pdfs/projects/eastside_revitalization_report.pdf," title="web.archive.org/web/20190210194315trimet.org/pdfs/projects/eastside_revitalization_report.pdf,">web.archive.org/web/20190210194315trimet.org/pdfs/projects/eastside_revitalization_report.pdf, February 10, 2019, On July 24, 2019, TriMet announced the permanent closure of the Mall stations, as well as a one-year pilot closure of Kings Hill/Southwest Salmon Street station, in an effort to speed up travel times. The closures took effect on March 1, 2020.Transfers to the Yellow Line are available at the Pioneer Square and Mall stations and Rose Quarter Transit Center, while transfers to the Green Line (beyond the shared Eastside MAX alignment) and the Orange Line can be made at the Pioneer Square and Mall stations. Additionally, the Blue Line provides connections to local and intercity bus services at various stops across the line, the Portland Streetcar at four stops in and near downtown Portland,WEB,portlandstreetcar.org/schedules, Maps + Schedules - Portland Streetcar, Portland Streetcar, October 11, 2018,web.archive.org/web/20190210194359/https://portlandstreetcar.org/schedules, February 10, 2019, and a transfer to WES Commuter Rail, which runs from Beaverton to Wilsonville during the morning and evening commutes on weekdays, at Beaverton Transit Center.WEB,trimet.org/wes/index.htm, WES Commuter Rail, TriMet, September 5, 2018,web.archive.org/web/20190210194435/https://trimet.org/wes/index.htm, February 10, 2019, {| class=“wikitable“|+ Key! scope=“col” | Icon! scope=“col” | PurposeTrain station#Terminus>Terminus ←| Westbound travel only{| class=“wikitable sortable plainrowheaders“|+ List of MAX Blue Line stations! scope=“col” | Station! scope=“col” | Location! scope=“col” data-sort-type=“usLongDate” | Commenced! scope=“col” class=“unsortable” | Line transfersMAP,trimet.org/maps/pdf/railsystem.pdf, Rail System Map with transfers, TriMet, July 25, 2018,web.archive.org/web/20190210194620/https://trimet.org/maps/pdf/railsystem.pdf, February 10, 2019, ! scope=“col” class=“unsortable” | NotesMAP,trimet.org/maps/pdf/citycenter.pdf, Portland City Center and Transit Mall, TriMet, July 30, 2018,web.archive.org/web/20200328191254/https://trimet.org/maps/pdf/citycenter.pdf, March 28, 2020, {{efn|name=connections|This list of service connections excludes TriMet bus connections. For a complete list that includes all transfers, see: List of MAX Light Rail stations.}}Hillsboro 1998| —| —| Hillsboro Central/Southeast 3rd Avenue Transit Center 1998| —Yamhill County Transit Area>YCTAHTTP://WWW.YCTRANSITAREA.ORG/PDF/NORTH.PDF >TITLE=MCMINNVILLE – HILLSBORO, ROUTE 33 URL-STATUS=DEAD ARCHIVE-DATE=OCTOBER 20, 2016, March 27, 2018, Tuality Hospital/Southeast 8th Avenue}} 1998| —| —Washington/Southeast 12th Avenue}} 1998| —| —Fair Complex/Hillsboro Airport}} 1998| —| —Hawthorn Farm}} 1998| —| —Orenco station (TriMet)>Orenco 1998| —| Connects to North Hillsboro LinkQuatama}} 1998| —| —| Willow Creek/Southwest 185th Avenue Transit Center 1998| —Columbia County Rider>CC Rider, North Hillsboro LinkElmonica/Southwest 170th Avenue}} Beaverton 1998| —| Near Elmonica maintenance facilityMerlo Road/Southwest 158th Avenue}} 1998| —| —Beaverton Creek}} 1998| —| —Millikan Way}} 1998| —| —Beaverton Central}} 1998| —| —| Beaverton Transit Center 1998size=18pxRed}}| Connects to WES Commuter Rail| Sunset Transit Center 1998size=18pxRed}}Oregon POINT>POINT, TCTDWashington Park station (TriMet)>Washington Park Portland 1998size=18pxRed}}| Connects to Washington Park Free ShuttleGoose Hollow/Southwest Jefferson Street}} 1998size=18pxRed}}| —Providence Park}} 1997size=18pxRed}}| —Library/Southwest 9th Avenue→ 1986size=18pxRed}} Connects to Portland StreetcarGalleria/Southwest 10th Avenue← 1986size=18pxRed}}Pioneer Square South→ 1986size=18pxGreen}} {{ricTriMetsize=18pxRed}} {{ricTriMet|Yellow}} Connects to Portland Transit MallPioneer Square North← 1986size=18pxGreen}} {{ricTriMetsize=18pxRed}} {{ricTriMet|Yellow}}Yamhill District→ 1986size=18pxRed}} —Morrison/Southwest 3rd Avenue← 1986size=18pxRed}}Oak Street/Southwest 1st Avenue}} 1986size=18pxRed}}| —Skidmore Fountain}} 1986size=18pxRed}}| —Old Town/Chinatown}} 1986size=18pxRed}}| —| Rose Quarter Transit Center 1986size=18pxGreen}} {{ricTriMetsize=18pxYellow}}C-Tran (Washington)>C-TranConvention Center station (TriMet)>Convention Center 1990size=18pxGreen}} {{ricTriMet|Red}}| Connects to Portland Streetcar{{br}}Northeast 7th Avenue}} 1986size=18pxGreen}} {{ricTriMet|Red}}| Connects to Portland StreetcarLloyd Center/Northeast 11th Avenue}} 1986size=18pxGreen}} {{ricTriMet|Red}}| —| Hollywood/Northeast 42nd Avenue Transit Center 1986size=18pxGreen}} {{ricTriMet|Red}}| —Northeast 60th Avenue}} 1986size=18pxGreen}} {{ricTriMet|Red}}| —Northeast 82nd Avenue}} 1986size=18pxGreen}} {{ricTriMet|Red}}| —| Gateway/Northeast 99th Avenue Transit Center 1986size=18pxGreen}} {{ricTriMet|Red}}Columbia Area TransitHTTP://CATRANSIT.ORG/SERVICE-ROUTES/CASCADE-LOCKS-PORTLAND/ PUBLISHER=COLUMBIA AREA TRANSIT ARCHIVE-URL=HTTPS://WEB.ARCHIVE.ORG/WEB/20180916201950/HTTP://CATRANSIT.ORG/SERVICE-ROUTES/CASCADE-LOCKS-PORTLAND/, September 16, 2018, East 102nd Avenue}} 1986| —| —East 122nd Avenue}} 1986| —| —East 148th Avenue}} 1986| —| —East 162nd Avenue}} 1986| —| —East 172nd Avenue}} Gresham 1986| —| —East 181st Avenue}} 1986| —| —Rockwood/East 188th Avenue}} 1986| —| —Ruby Junction/East 197th Avenue}} 1986| —| Near Ruby Junction maintenance facilityCivic Drive}} 2010| —| —Gresham City Hall}} 1986| —| —| Gresham Central Transit Center 1986| —| Connects to Sandy Area MetroInstitute for Transportation and Development Policy study conducted in September 2013, the Blue Line was credited with generating $6.6 billion in transit-oriented development investment.NEWS, Rose, Joseph, Study: Blue Line is a big moneymaker, The Oregonian, September 25, 2013, 7,

Service

From Monday to Thursday, the Blue Line runs for 22{{frac|1|2}} hours per day. The first train goes westbound from Elmonica/Southwest 170th Avenue station at 3:31 am and the last trip goes eastbound from Rose Quarter Transit Center to Ruby Junction/East 197th Avenue station at 1:29 am the following day. Additional late-night trips are provided on Fridays, with the last trip going eastbound from Hatfield Government Center station to Elmonica/Southwest 170th Avenue station at 2:01 am. Except for additional late-night trips on Saturdays, weekend service runs on a slightly reduced schedule. The first trains run westbound from Ruby Junction/East 197th Avenue station at 3:35 am and the last trains run eastbound from Hatfield Government Center station at 1:51 am and Rose Quarter Transit Center at 1:33 am, respectively. Select early morning trains operate as through services of the Red Line and the Yellow Line. End-to-end travel time is approximately 105 minutes.MAX Blue Line schedules:

Ridership

During the Eastside MAX’s construction, the line was projected to carry 12,000 riders per day. It averaged around 22,000 during its first four days of regular operation and had leveled at 18,000 by December 1986.NEWS, Hayakawa, Alan, MAX training fast; ridership proves it, The Oregonian, September 18, 1986, 1, In June 1987, TriMet’s general manager, James Cowen, claimed MAX ridership had grown to a point where it was “a peak all day” with a farebox recovery ratio of 50 percent.NEWS, Hill, Jim, TriMet’s manager predicts westside light rail, June 10, 1987, The Oregonian, B7,infoweb.newsbank.com/apps/news/document-view?p=EANX-NB&docref=image%2Fv2%3A11A73E5827618330%40EANX-NB-132A940130F7CA1D%402446957-1328D7C713A458EA%4037-1328D7C713A458EA%40, April 9, 2022, registration, NewsBank, July 31, 2022,web.archive.org/web/20220731220641/https://infoweb.newsbank.com/apps/news/user/login?destination=document-view%3Fp%3DEANX-NB%26docref%3Dimage/v2%253A11A73E5827618330%2540EANX-NB-132A940130F7CA1D%25402446957-1328D7C713A458EA%254037-1328D7C713A458EA%2540, live, Two years after the opening of the Westside MAX, the system had been recording over 71,000 daily riders, a figure that was not anticipated until 2005.NEWS, Stewart, Bill, Westside MAX celebrates two years on track, The Oregonian, September 13, 2000, C3, To relieve overcrowding, TriMet extended the Red Line further west to Beaverton Transit Center on August 31, 2003. From 2004 to 2007, TriMet recorded 18 percent and 27 percent increases in utilization between Hatfield Government Center station and Beaverton Transit Center during morning and evening rush hours, respectively, prompting the agency to add three Red Line trains running up to Hatfield Government Center on March 2, 2008.NEWS, TriMet extends rush-hour MAX trains between Hillsboro, PDX, Beaverton Valley Times, March 3, 2008,www.beavertonvalleytimes.com/news/story.php?story_id=120457811698504200,www.beavertonvalleytimes.com/news/story.php?story_id=120457811698504200," title="web.archive.org/web/20080511082439www.beavertonvalleytimes.com/news/story.php?story_id=120457811698504200,">web.archive.org/web/20080511082439www.beavertonvalleytimes.com/news/story.php?story_id=120457811698504200, dead, May 11, 2008, November 1, 2015, In the first three months of 2017, the Blue Line recorded an average 55,233 rides per weekday, a drop of 2.9 percent from the same period in 2016.NEWS, Keizur, Christopher, Safe travels?, Portland Tribune,portlandtribune.com/go/42-news/362854-242841-safe-travels, June 12, 2017,web.archive.org/web/20180804050017/https://portlandtribune.com/go/42-news/362854-242841-safe-travels, August 4, 2018, August 3, 2018, TriMet attributes the drop to lower-income riders being forced out of the inner city by rising housing prices.WEB, Zielinski, Alex, You Know Portland’s Transportation Woes Have Reached a Breaking Point When..., Portland Mercury,www.portlandmercury.com/blogtown/2018/05/18/19925551/you-know-portlands-transportation-woes-have-reached-a-breaking-point-when, May 18, 2018,web.archive.org/web/20180804045911/https://www.portlandmercury.com/blogtown/2018/05/18/19925551/you-know-portlands-transportation-woes-have-reached-a-breaking-point-when, August 4, 2018, August 3, 2018, The Blue Line is currently the busiest line in the MAX system, carrying 18.9 million passengers in 2015. It averaged 55,370 riders on weekdays in September 2018, up from 55,330 for the same month in 2017.WEB,trimet.org/about/pdf/2017/2017-09.pdf, September 2017 Monthly Performance Report, TriMet, October 18, 2017, March 16, 2019,web.archive.org/web/20190302151649/https://trimet.org/about/pdf/2017/2017-09.pdf, March 2, 2019,

Notes

{{notelist}}

References

{{reflist}}

Sources

External links

{{Commons category|MAX Blue Line}}
  • WEB,trimet.org/schedules/maxblueline.htm, MAX Blue Line, TriMet,
  • Historic American Engineering Record (HAER) documentation, filed under Beaverton, Washington County, OR:
    • {{HAER |survey=OR-59 |id=or0330 |title=Oregon Electric Railway Westside Corridor |photos=20 |data=10 |cap=1 |link=no}}
    • {{HAER |survey=OR-59-A |id=or0357 |title=Oregon Electric Railway Westside Corridor, Hillsboro Extension |photos=14 |data=10 |cap=2 |link=no}}
{{Portland Transit}}

- content above as imported from Wikipedia
- "MAX Blue Line" does not exist on GetWiki (yet)
- time: 2:57am EDT - Wed, May 22 2024
[ this remote article is provided by Wikipedia ]
LATEST EDITS [ see all ]
GETWIKI 21 MAY 2024
GETWIKI 09 JUL 2019
Eastern Philosophy
History of Philosophy
GETWIKI 09 MAY 2016
GETWIKI 18 OCT 2015
M.R.M. Parrott
Biographies
GETWIKI 20 AUG 2014
CONNECT