SUPPORT THE WORK

GetWiki

Gatwick Airport railway station

ARTICLE SUBJECTS
aesthetics  →
being  →
complexity  →
database  →
enterprise  →
ethics  →
fiction  →
history  →
internet  →
knowledge  →
language  →
licensing  →
linux  →
logic  →
method  →
news  →
perception  →
philosophy  →
policy  →
purpose  →
religion  →
science  →
sociology  →
software  →
truth  →
unix  →
wiki  →
ARTICLE TYPES
essay  →
feed  →
help  →
system  →
wiki  →
ARTICLE ORIGINS
critical  →
discussion  →
forked  →
imported  →
original  →
Gatwick Airport railway station
[ temporary import ]
please note:
- the content below is remote from Wikipedia
- it has been imported raw for GetWiki
{{Short description|Railway station in West Sussex, England}}{{Use dmy dates|date=October 2015}}{{Use British English|date=October 2015}}







factoids
21.225|railexits1920 = {{decrease}} 21.0511em}}{{nochange}} 1.527|railexits2021 = {{decrease}} 1.6861em}}{{decrease}} 0.319|railexits2122 = {{increase}} 5.9191em}} {{increase}} 0.909|railexits2223 = {{increase}} 16.5081em}} {{decrease}} 0.853|platforms = 7|access = yes|access_note = {{citation step free south east rail}}|years1 = 1891|events1 = Opened as Gatwick|years2 = 1935|events2 = original Gatwick Airport station opened as Tinsley Green|years3 = 1946|events3 = Gatwick station renamed Gatwick Racecourse|years4 = 27 May 1958|events4 = Original station closed and Gatwick Racecourse station rebuilt and renamed Gatwick Airport|original = London, Brighton & South Coast Railway|map_type = West Sussex51.1565type:railwaystation_region:GB_scale:10000|display=inline,title}}|gridref = TQ287413}}Gatwick Airport railway station is on the Brighton Main Line in West Sussex, England. It serves Gatwick Airport, {{convert|26|mi|47|chain|km}} down the line from {{stn|London Bridge}} via {{rws|Redhill}}. The platforms are about {{convert|70|m}} to the east of the airport's South Terminal, with the ticket office above the platforms and station entrances and exits directly connected to the terminal. The station is also connected to the airport's North Terminal by the Airport Shuttle people-mover. Gatwick Airport was the busiest station in South East England from 2017 to 2018.WEB,weblink Busiest stations in Britain, Office of Rail & Road, There have been two stations at Gatwick, sited about {{convert|0.85|mi|km}} from each other. It is the busiest station in both West Sussex and South East England, and the sixth busiest station in the UK outside of London.WEB,weblink Office of Rail & Road, The first railway station, Gatwick, opened in September 1891. In 1946, it was renamed Gatwick Racecourse, to reflect its association with the neighbouring Gatwick Racecourse, but fell out of use for a decade after the opening of Tinsley Green station, which was renamed Gatwick Airport in September 1935. The stations had a reversal of fortunes in the 1950s as a result of a government decision to expand and develop the Beehive airport terminal into London's second airport. Gatwick Racecourse station was rebuilt to serve Gatwick Airport, and is integrated into its terminal. On 27 May 1958, the rebuilt station, which took over the name Gatwick Airport, was opened in conjunction with a regular train service; and services to Tinsley Green were discontinued.Train services are provided by Southern, Gatwick Express, Thameslink and Great Western Railway. When viewed from the air (or in satellite imagery), the station's British Rail logo etched on the roof is visible.WEB,weblink Google Maps, Google Maps, 8 April 2018, Between late 2010 and early 2014, new facilities were built at the station, among them platform 7; infrastructure was renewed and the concourse was refurbished. The station was one of 18 managed by Network Rail,WEB,weblinkweblink" title="web.archive.org/web/20120901235303weblink">weblink 1 September 2012, Commercial information, December 2011, Complete National Rail Timetable, Network Rail, London, 41, 9 January 2012, but, in 2012, management was transferred to Southern.WEB,weblinkweblink" title="web.archive.org/web/20121108225158weblink">weblink 8 November 2012, Management of Gatwick Airport railway station transfers to Southern, 30 January 2012, In May 2018, the station was named as the second-least popular major station in the UK.WEB, Jarmyn, Luke,weblink Gatwick Airport train station labelled 'embarrassment' after it's named second least popular 'major' UK station, Surrey Live, 9 May 2018,

History

Gatwick/Gatwick Racecourse Station

In September 1891, Gatwick station was constructed on the present site to serve Gatwick Racecourse, but operated only on race days. The facilities included passing loops and sidings, which enabled race trains to be held without impeding regular traffic on the Brighton Main Line.BOOK, Turner, John Howard, 1979, The London Brighton and South Coast Railway 3 Completion and Maturity, Batsford, 0-7134-1389-1, 128–9, During the First World War, the sidings were extended to accommodate munitions trains heading for Newhaven.BOOK, Pratt, Edwin, 1921, British railways and the Great War, Selwyn & Blount, 1038–9, In 1946, Gatwick station was renamed Gatwick Racecourse until 1958. The station had fallen out of regular use after the opening of nearby Tinsley Green/Gatwick Airport Station.WEB,weblink Gatwick Airport Railway Station, Railway Technology, 1 July 2018, In the early 1950s, the airport was expanded over land formerly occupied by the racecourse, and it was decided to rebuild the station. The station was integrated into the airport terminal via an upper level concourse designed by British Rail Southern Region. On 27 May 1958, the rebuilt station, Gatwick Airport, opened with a regular train service.WEB,weblink Our History, Gatwick Airport, 1 July 2018,

Tinsley Green/Gatwick Airport Station

(File:Gatwick Airport station site geograph-3559906-by-Ben-Brooksbank.jpg|thumb|right|Site of the original Gatwick Airport station at Tinsley Green)On 30 September 1935 Tinsley Green station was opened {{convert|0.85|mi|km}} south of the present station. Within a year it was renamed Gatwick Airport, following the completion of the Beehive airport terminal, which had a direct subway connection to the station. In 1940, the airport was requisitioned by the Royal Air Force (RAF) for military use. In 1952, the government decided to expand the airport as London's second airport. The station continued in operation until 27 May 1958 when the new Gatwick Airport station (above) opened. The old station was later demolished. The only visible remains of the old station are sections of the former up slow line platform and sections of the subway between the station and the original terminal building.{{Cn|date=December 2022}}

Present station

The 1958 facilities included a parcels office beneath the main concourse, lifts and a corridor on the south side of the overbridge, separated from the passenger corridor by a glazed partition. To accommodate trains of up to 12-carriage lengths, the three old Racecourse island platforms were raised by {{convert|1|ft|abbr=on}} and extended to the north by about {{convert|100|ft|abbr=on}}, except for the very long westernmost platform, which was reduced from the south. The ticket office on the main concourse of the station was able to handle 670 separate issues of Edmondson tickets from its Bellmatic equipment. The signalbox was retained on the centre platform.MAGAZINE, New Southern Region Station for Gatwick Airport, Railway Magazine, July 1958, 489–491, In the 1980s, the station was refurbished. The station had six platforms immediately beneath the airport's South Terminal.The ticket office is staffed for ticket sales and enquiries, supplemented by ticket machines capable of handling online bookings usually available on a round-the-clock basis. Automated teller machines, payphones and e-mail access points are installed on the main concourse. There are coin-operated trolleys for luggage and a left luggage facility. On-site food and drink outlets are present. Toilets are available and baby changing facilities and additional toilets can be found in the adjacent South Terminal. There is no car parking facility. Transport for London's (TfL) Oyster cards and contactless cards are accepted for travel at the station.WEB,weblink Gatwick and Surrey stations to accept Oyster cards and contactless payments, 13 November 2015, itv.com, 8 April 2018,

Redevelopment

(File:Gatwick Airport station - geograph.org.uk - 1540749.jpg|thumb|The station in 1979.)(File:Gatwick Airport stn December 2023 10.jpg|thumb|The railway station's main hall after its refurbishment)On 13 October 2010, a £53 million redevelopment programme was announced to provide another platform capable of accommodating 12-car trains, refurbishment of the concourse, and track and signal upgrades.NEWS,weblink BBC News, Gatwick Airport unveils £53m station revamp, 13 October 2010, Escalators and lifts were provided for platforms 5 and 6, replacing a staircase to achieve improved circulation. The redevelopment provided improved capacity and flexibility on the Brighton Main Line. The project was jointly financed by Network Rail, who contributed £44.9 million, and Gatwick Airport who provided £7.9 million. Construction was structured so as not to negatively affect the 2012 Summer Paralympics, which was hosted in London.By 3 February 2014, completion was marked by a ceremony officiated by Minister of State for Transport Baroness Kramer, who formally opened the new platform.JOURNAL, New platform opens as part of Gatwick Airport improvement work, Rail (magazine), Rail, 743, 5–18 March 2014, 20, Nigel Harris, Constructed by VolkerFitzpatrick, platform 7 is served by a {{convert|975|m|ft|adj=on}} loop from the down fast line and used by services which formerly used at platform 5. VolkerFitzpatrick were responsible for track and signalling modifications.WEB,weblink Extra platform opened at Gatwick Airport station, 10 March 2014, Railway Gazette, 3 February 2014, This has allowed platforms 5 and 6 to be dedicated to Gatwick Express services, thereby eliminating previous conflicts with slower services when they crossed to platforms 1 and 2.WEB,weblink Gatwick Airport Station Redevelopment Project, 10 March 2014, Network Rail, Network Rail, 2011, dead,weblink" title="web.archive.org/web/20140827052518weblink">weblink 27 August 2014, The project was finished on schedule and budget, despite extreme weather conditions during the winter of 2013/2014.In 2014, Baroness Kramer announced that the government had committed £50 million towards further improvements. A scheme for further improvements, estimated to cost around £120 million, was announced by Network Rail.MAGAZINE, Pitcher, Greg,weblink Gatwick rail station to get £120M upgrade, New Civil Engineer, 5 December 2014, In April 2018, Network Rail submitted a planning application for modernising the station; doubling the size of the concourse, widening two platforms, and improving connections to the airport terminal. It was done in partnership with Gatwick Airport authorities, the Coast to Capital local enterprise partnership and the Department for Transport.WEB,weblink Gatwick Airport station upgrade planned, Railway Gazette, 16 April 2018, WEB,weblink Proposals have been submitted for Gatwick Airport station upgrade, International Airport Review, 11 April 2018, The expansion is an element of a five-year programme, costed at £1.11 billion, announced by Gatwick Airport in early 2018.WEB,weblink New five-year £1.11 billion programme announced by Gatwick Airport, Crawley Observer, 12 June 2018, Construction on the new concourse began in November 2020. The refurbished station opened on 21 November 2023.NEWS, 2023-11-21, Gatwick Airport: Revamped railway station opens to customers, en-GB, BBC News, BBC English Regions, Royal Tunbridge Wells,weblink 2023-11-26,

Services

As of February 2024, train services at Gatwick Airport are operated by Southern, Gatwick Express, Thameslink and Great Western Railway:
  • Platform 1: Thameslink services to Bedford and Peterborough via Redhill
  • Platform 2: Services to London Victoria (Southern) and Reading (Great Western Railway)
  • Platform 3: Thameslink services to Three Bridges and Horsham
  • Platform 4: Services to London Victoria, London Bridge, Bedford and Cambridge
  • Platform 5: Northbound services to London Victoria (including Gatwick Express services) and interchangeable with Platform 4
  • Platform 6: Southbound services to Brighton (Gatwick Express), Southampton Central, Bognor Regis, Portsmouth & Southsea and Littlehampton and interchangeable with Platform 7
  • Platform 7: Southbound services to Brighton (Thameslink), Ore and Eastbourne
Services at the station are as follows:

Southern

The typical off-peak service in trains per hour is:WEB,weblink May 2022 Timetables, Southern (Govia Thameslink Railway), Southern, 31 May 2022, {{NRtimes|May 2022|51, 52, 148, 183, 184, 185, 186, 188, 189}}
  • 6 tph to {{stn|London Victoria}}
  • 2 tph to {{stnlnk|Eastbourne}} of which 1 continues to {{stnlnk|Ore}}
  • 2 tph to {{stnlnk|Littlehampton}} via {{stnlnk|Worthing}}
  • 1 tph to {{stnlnk|Bognor Regis}} and Portsmouth & Southsea, dividing at {{stnlnk|Horsham}}
  • 1 tph to Bognor Regis and {{stnlnk|Southampton Central}}, dividing at Horsham
On Sundays, a London Victoria to Brighton service runs half hourly. However, services between London Victoria and Eastbourne, as well as the services to Bognor Regis and Southampton Central do not run. In addition, services between London Victoria and Littlehampton reduce to hourly, and the services to Bognor Regis and Portsmouth & Southsea extend to Portsmouth Harbour, and divide at Barnham, instead of Horsham.Services at Gatwick Airport are operated using {{brc|377}} EMUs.

Gatwick Express

The typical off-peak service in trains per hour is:WEB,weblink May 2022 Timetables, Gatwick Express, 31 May 2022,
  • 2 tph to {{stn|London Victoria}} (non-stop)
  • 2 tph to {{stnlnk|Brighton}} (calling at Haywards Heath only)
On Sundays, the services to Brighton do not run, with Gatwick Express trains operating as a shuttle between Gatwick Airport and London Victoria only.Gatwick Express services are operated using {{brc|387}} EMUs.

Thameslink

The typical off-peak service in trains per hour is:WEB,weblink May 2022 Timetables, Govia Thameslink Railway, Thameslink, 31 May 2022,
  • 4 tph to {{stnlnk|Bedford}} via London Bridge
  • 2 tph to {{stnlnk|Cambridge}}
  • 2 tph to {{stnlnk|Peterborough}} via {{stnlnk|Redhill}}
  • 4 tph to {{stnlnk|Brighton}} (semi-fast)
  • 2 tph to {{stnlnk|Horsham}} (stopping)
  • 2 tph to Three Bridges
On Sundays, the services between Horsham and Peterborough do not run, and instead, 1tph usually terminating at Three Bridges is extended to HorshamThameslink services at Gatwick Airport are operated using {{brc|700}} EMUs.

Great Western Railway

The typical off-peak service in trains per hour is:WEB,weblink Timetable T9: Reading to Guildford, Redhill and Gatwick Airport, Great Western Railway (train operating company), Great Western Railway, 17 December 2023,
  • 2 tph to {{stnlnk|Reading}} via {{stnlnk|Guildford}}
Great Western Railway services at Gatwick Airport are operated using {{brc|165}} and {{brc|166|n}} DMUs.{{rail start}}}}}}}}}}}}}}}}}}

References

{{Reflist|2}}

External links

{{Commons category|Gatwick Airport railway station}}{{stn art lrnk|GTW|RH60RD}}{{Crawley}}{{UK Airport stations}}{{Major railway stations in Britain}}{{West Sussex railway stations}}{{TSGN and SE Stations|CityFlyer=y|Redhill=y|Mainline West=y|Brighton Express=y|Gatwick Express=y|Mainline East=y|SE None=y}}{{authority control}}

- content above as imported from Wikipedia
- "Gatwick Airport railway station" does not exist on GetWiki (yet)
- time: 8:36am EDT - Sat, May 18 2024
[ this remote article is provided by Wikipedia ]
LATEST EDITS [ see all ]
GETWIKI 23 MAY 2022
GETWIKI 09 JUL 2019
Eastern Philosophy
History of Philosophy
GETWIKI 09 MAY 2016
GETWIKI 18 OCT 2015
M.R.M. Parrott
Biographies
GETWIKI 20 AUG 2014
CONNECT