SUPPORT THE WORK

GetWiki

Altoona Transportation Center

ARTICLE SUBJECTS
aesthetics  →
being  →
complexity  →
database  →
enterprise  →
ethics  →
fiction  →
history  →
internet  →
knowledge  →
language  →
licensing  →
linux  →
logic  →
method  →
news  →
perception  →
philosophy  →
policy  →
purpose  →
religion  →
science  →
sociology  →
software  →
truth  →
unix  →
wiki  →
ARTICLE TYPES
essay  →
feed  →
help  →
system  →
wiki  →
ARTICLE ORIGINS
critical  →
discussion  →
forked  →
imported  →
original  →
Altoona Transportation Center
[ temporary import ]
please note:
- the content below is remote from Wikipedia
- it has been imported raw for GetWiki
{{Short description|Railroad and bus station in Altoona, Pennsylvania, US}}







factoids
| style = Amtrak| image = Altoona station.jpg| image_caption = Altoona Transportation Center’s Amtrak platform| address = 1231 11th Avenue| borough = Altoona, Pennsylvania| country = United States4056784display=inline,title}}| line = Norfolk Southern Pittsburgh Line (Keystone Corridor)AMTRAN (Altoona Transit)>AMTRAN: 1, 2, 3, 4, 5, 6, 7, 9, 11, 12, 14AMTRAN REGULAR ROUTES>PUBLISHER= AMTRAN URL= HTTP://WWW.AMTRAN.ORG/REGULAR-ROUTES, 10 July 2020, {{bus icon}} Greyhound Lines| platform = 1 side platform| tracks = 4| parking = | bicycle = system=AmtrakAltoona}}{{Amtrak ridershippass_year={{Amtrak ridership|date}}}}| opened = | rebuilt = 1887; 1972; 1983–1986| accessible = YesALT}}Altoona, Pennsylvania>City of Altoona| zone = system=Amtrakleft=Johnstown|right=Tyrone}}| other_services_header = Former services| other_services_collapsible = yessystem1=Amtrakleft2=Johnstownnote-mid2=1995–2005left3=Johnstownnote-mid3=Until 1995left4=Johnstownnote-mid4=Until 1979}}|mapframe = yesAmtrak}}}}The Altoona Transportation Center is an intermodal passenger facility in downtown Altoona, Pennsylvania. It is served by the daily Amtrak {{lnl|Amtrak|Pennsylvanian}}, Greyhound Lines intercity buses, and AMTRAN local bus service (for which is serves as the hub). The station was built in 1986, replacing a temporary station, which had in turn replaced the 1887-built Pennsylvania Railroad station in 1972.

History

(File:Pennsylvanian at Altoona, June 1981.jpg|left|thumb|A westbound Pennsylvanian stops at the temporary station, June 1981.)The Altoona Transportation Center stands on the site of the old Altoona station, which was constructed in 1887 immediately to the West of the Logan House Hotel.WEB, Blair County Pennsylvania Railroad Stations,www.west2k.com/pastations/blair.shtml, 2020-07-11, www.west2k.com, When Amtrak took over intercity passenger service in May 1971, it retained two daily round trips serving Altoona – the {{lnl|Amtrak|Duquesne}} and the combined {{lnl|Amtrak|Broadway Limited}}/{{lnl|Amtrak|Spirit of St. Louis}}.NEWS,www.newspapers.com/article/the-pittsburgh-press/125881574/, System Puts City On Amtrak, The Pittsburgh Press, May 2, 1971, 11, Newspapers.com, The Spirit of St. Louis was renamed {{lnl|Amtrak|National Limited}} on July 12, 1971, and began operating separately from the Broadway Limited between Pittsburgh and Harrisburgh.{{Sanders-Heartland}}{{rp|18}} The Duquesne was renamed Keystone on November 14, 1971, and discontinued on April 30, 1972. To replace it, the National Limited was rescheduled to no longer cross Pennsylvania late at night.{{Fifty Years of Amtrak Trains}}{{rp|91}} Amtrak and Penn Central vacated the old station effective November 6, 1972; it was demolished to make room for a parking garage. Although Penn Central originally planned a $400,000 replacement station, a {{convert|12x60|ft|adj=on}} trailer instead served as a ticket office and waiting room.NEWS,www.newspapers.com/article/tyrone-daily-herald/125882629/, News From Around Here, Tyrone Daily Herald, June 9, 1972, 1, Newspapers.com, NEWS,www.newspapers.com/article/tyrone-daily-herald/125882596/, News From Around Here, Tyrone Daily Herald, November 6, 1972, 1, Newspapers.com, The National Limited was discontinued on October 1, 1979.{{rp|62}} It was replaced by the {{lnl|Amtrak|Pennsylvanian}} on April 27, 1980.{{rp|75}} From April 26, 1981, to January 30, 1983, the {{lnl|Amtrak|Fort Pitt}} provided an additional Altoona–Pittsburgh service.{{rp|91}}Planning of an improved transportation center was a controversial topic in the Altoona area. Candidates for city positions structured their campaigns around the expense of, feasibility of, and location of the pending transit hub.NEWS, Jesse W. Zorger - City Council, The Altoona Mirror,www.newspapers.com/image/20040954/, NEWS, 29 October 1981, David N. Korns for Controller, The Altoona Mirror,www.newspapers.com/image/20041050/, Projected costs ranged anywhere from 10 million dollars to 3 million dollars. On August 12, 1982, the Altoona Area Chamber of Commerce voted unanimously in favor of a new Transportation Center.NEWS, 14 August 1982, Chamber Vows to Support Center, The Altoona Mirror,www.newspapers.com/image/20100525/, 11 July 2020, By October of the same year Harry Weese and Associates, an architectural firm from Washington D.C., had been chosen to conduct a series of surveys in order to determine the optimal location for the proposed structure.NEWS, Stevens, Kay, 9 October 1982, Firm Resumes Work on City Transit Center, The Altoona Mirror,www.newspapers.com/image/20110418, 11 July 2020, Ultimately, urban renewal parcels 14A, 14B, 16A, and 16B were chosen, and the Transportation Center was merged into an existing Altoona Parking Authority project, creating the hybrid parking garage/transit facility that exists today.NEWS, Mulhollem, Jeff, 22 October 1986, Improved lots open tomorrow, The Altoona Mirror,www.newspapers.com/image/20155324/, 11 July 2020, The facility opened on October 23, 1986 after being completed for $3.2 million,NEWS, 6 March 1988, Teamwork, byword of Intown development, The Altoona Mirror,www.newspapers.com/image/19872232/, 11 July 2020, an estimated $500,000 under budget. The cost of construction was completely covered by a federal grant.In 1995, the Broadway Limited was replaced by the Three Rivers. The Pennsylvanian was discontinued in November 2004, leaving Altoona with only a single daily round trip. The Pennsylvanian resumed on March 7, 2005, when the Three Rivers was discontinued.{{rp|94}} In March 2020, the Pennsylvanian was suspended as part of a system-wide service reduction in response to the growing COVID-19 pandemic.WEB, Amtrak Advisory {{!, Amtrak to Operate on Modified Schedules|url=https://www.amtrak.com/service-adjustments-due-to-coronavirus|access-date=2020-07-11|website=www.amtrak.com|language=en}} Service resumed on June 1, 2020.WEB, 2020-05-21, Amtrak announces re-opening of some Pa. service, with new safety guidelines,www.pennlive.com/life/2020/05/amtrak-announces-re-opening-of-some-pa-service-with-new-safety-guidelines.html, 2020-07-11, pennlive, en,

References

{{Reflist}}

External links

{{Commons category-inline}}{{Amtrak web|ALT|Altoona, PA}}{{Amtrak Pennsylvania stations}}{{Altoona, Pennsylvania}}{{PRR Main Line stations}}

- content above as imported from Wikipedia
- "Altoona Transportation Center" does not exist on GetWiki (yet)
- time: 7:32am EDT - Wed, May 22 2024
[ this remote article is provided by Wikipedia ]
LATEST EDITS [ see all ]
GETWIKI 21 MAY 2024
GETWIKI 09 JUL 2019
Eastern Philosophy
History of Philosophy
GETWIKI 09 MAY 2016
GETWIKI 18 OCT 2015
M.R.M. Parrott
Biographies
GETWIKI 20 AUG 2014
CONNECT